Name of
Project |
Brief Description of
the Project |
Subdivision/Hotel/Condo
Name |
Developer / Owner |
MCWD Supervising Unit |
Project
Amount |
Project Duration |
Date Started |
Target Completion Date |
Accomplish- ment To Date |
Remarks |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Water System |
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Prop. PVC Water Distribution
System for Amara Subdivision - Phase 6 (Catarman, Liloan, Cebu) |
484 LM x 75mm
dia., 781 LM x 100mm dia., 167 LM x 150mm dia. |
Amara Subdivision |
Cebu Holdings, Inc. |
Project Management Office |
PhP |
|
92 CD |
May 15, 2012 |
Aug 14, 2012 |
96.00% |
Contractor is on the process of
purchasing the handhole cover and AV/AR head. |
|
|
|
2.0 |
Prop. Rerouting
of PVC Water Distribution Line for Amara Subdivision (Catarman, Liloan, Cebu) |
1,650 LM x 150mm dia. |
Amara
Subdivision |
Cebu Holdings, Inc. |
Project
Management Office |
PhP |
|
92 CD |
May 15, 2012 |
Aug 14, 2012 |
98.00% |
The only
remaining work is the disinfection of a portion of the water system of the
subdivision at phase 3b. |
|
|
|
3.0 |
Prop. Water Distribution System
for Pueblo De Oro Communities (Sitio Judas Belt, Babag II, Lapu-lapu City) |
6,920 LM x
75mm dia., 2,071 LM x 100mm dia., 1,286 LM x 150mm dia., 49 LM x 200mm dia.,
151 LM x 250mm dia. |
Pueblo De Oro Communities
(Horizon, La Aldea Del Mar, and Parkplace) |
Pueblo De Oro Development Corp. |
Project
Management Office |
PhP |
############ |
|
|
|
41.00% |
Developer is implementing the
pipelaying works on this project area by area. Seven areas have already been
turned-over to MCWD. Pipelaying is ongoing for the next area. |
|
|
|
4.0 |
Prop. Water
Distribution Systems for Mactan Plains Subdivision |
114
LM x 100mm dia. PVC and 810 LM 75mm dia. PVC water distribution line |
Mactan Plains
Subdivision |
Pacific Land
Ventures and Property Development, Inc. |
Project
Management Office |
PhP |
1,617,764.80 |
|
Jun 25, 2013 |
|
15.00% |
Pipelaying
works is ongoing. |
|
|
5.0 |
Prop. Water
System Design for Goldmine Residences (Bangkal-Mahayahay-Soong, Lapulapu
City) |
236
LM x 150mm dia. PVC, 32 LM 100mm dia. PVC, 152 LM 75mm dia. PVC, 617 LM 50mm
dia. PVC |
Goldmine
Residences |
Heritage Supreme
Land Developer, Inc. |
Project
Management Office |
PhP |
3,215,481.65 |
|
Oct 14, 2013 |
|
|
Developer is
awaiting for the well to be constructed by EWRD-KC. After the well, the
installation of the interconnecting pipeline will have to be done by MCWD
before the water system of the subdivision will be implemented. |
|
|
6.0 |
Prop. Water
Sytem for Graceland 1 & Graceland Annex Subdivision (Brgy. Buaya, Mactan,
Lapulapu City) |
39
lm x 100mm dia PVC, 29 lm x 50mm dia PVC |
Graceland 1 and
Graceland Annex Subdivision |
Kaiser Urban
Development Corp. |
Project
Management Office |
PhP |
858,046.50 |
11 Working Days |
Jul 7, 2014 |
Jul 21, 2014 |
55.00% |
Graceland Annex
1 has been completed and final inpection was conducted on March 22, 2016. No
activity conducted for Graceland Annex Subdivision Phase 2. |
|
|
7.0 |
Prop. Water
System Design for South Covina Subdivision (Brgy. Dumlog, Talisay City, Cebu) |
42
lm x 100mm dia PVC, 110 lm x 75mm dia PVC, and 346 lm x 50mm dia PVC |
South Covina
Subdivision |
Athecor
Development Corporation |
Project
Management Office |
PhP |
1,177,338.75 |
71 Working Days |
Sep 18, 2014 |
Dec
17, 2014 |
|
Developer is on the
process of procurement of materials. |
|
|
8.0 |
Prop. Water
Distribution System for Peninsula Subdivision (Sudtungan Road, Brgy. Basak,
Lapulapu City) |
42
lm x 100mm dia PVC, 110 lm x 75mm dia PVC, and 346 lm x 50mm dia PVC |
Peninsula Place
Subdivision |
Peninsula Resort
Corporation |
Project
Management Office |
PhP |
1,196,027.58 |
52 Calendar Days |
Oct 1, 2014 |
Nov
21, 2014 |
90.00% |
Interconnection
works is completed. Remaining works: restoration of the interconnection point
is remaining, flushing and disinfection. |
|
Project is completed
except for the interconnection works which is yet to be implemented. |
|
|
9.0 |
Prop. Water
Distribution System for Rose Pike Subdivision (Forest Hills, Kalubihan,
Banawa, Brgy. Guadalupe, Cebu City) |
228
lm x 50mm dia PVC |
Rose Pike
Subdivision |
F.S. Baltazar
Builders |
Project
Management Office |
PhP |
1,415,707.20 |
45 Calendar Days |
Feb 17, 2015 |
Apr
2, 2015 |
80.00% |
This project project
is composed of two phases - Phase 1 and Phase 2. Phase 1 is physically
completed. Developer has requested for the partial turn-over of Phase 1.
Phase 1 has already passed potability test on August 26, 2016. Awaiting for
the Developer to submit the as-built plan so that Phase 1 will be
commissioned. Phase 2 is ongoing at 30% accomplishment. |
|
|
10.0 |
Prop.Water
Distribution System for Villa Sebastiana Subdivision (Brgy. Tawason, Mandaue
City, Cebu) |
126
lm x 100mm dia PVC, 72 lm x 75mm dia PVC, 438 lm x 50mm dia PVC |
Villa
Sebastiana Subdivision |
Aidfaz
Development Corporation |
Project
Management Office |
PhP |
1,343,438.70 |
38
Working Days |
Jul 29, 2015 |
Sep 14, 2015 |
97% |
Project
is completed. Conducted potability testing. Awaiting for potability test
result from MCWD laboratory. |
|
|
|
11.0 |
Prop.Water
Distribution System for Blessed Sacrament Subdivision (Kagudoy Road, Brgy.
Basak, Lapulapu City) |
96
lm x 100mm dia PVC, 162 lm x 75mm dia PVC, 588 lm x 50mm dia PVC |
Blessed
Sacrament Subdivision |
Cebu
Peoples Multi Purpose Cooperative |
Project
Management Office |
PhP |
2,673,187.14 |
- |
Nov 16, 2015 |
- |
10% |
Some
of the materials have already arrived and has already passed MCWD QC testing. |
|
|
|
12.0 |
Prop.Water
Distribution System for Brookridge Subdivision (Dr. Pablo Abella St.,
Labangon, Cebu City) |
140
lm x 100mm dia PVC, 201 lm x 50mm dia PVC, 12 lm x 50mm dia GI |
Brookridge
Subdivision |
Primary
Homes, Incorporated |
Project
Management Office |
PhP |
2,414,108.22 |
41
Working Days |
Feb 4, 2016 |
Mar 22, 2016 |
|
Developer
is on the process of procurement of materials and excavation permit. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section IV. Ongoing Subdivision/Hotel/Condo Water System Projects 9 |
|
|
Name of Project |
Brief Description of
the Project |
Subdivision/Hotel/Condo
Name |
Developer / Owner |
MCWD Supervising Unit |
Project
Amount |
Project Duration |
Date Started |
Target Completion Date |
Accomplish- ment To Date |
Remarks |
|
|
|
|
|
|
|
|
|
2. Flowmeter Assembly
and Vault |
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Prop. Ø100mm Flowmeter Enclosed
in Reinforced Concrete Vault for Alegria Palms Subdivision 2 (Brgy. Gabi,
Cordova, Cebu) |
dia.100mm
flowmeter, construction of reinforced concrete vault & interconnection |
Alegria
Palms Subdivision 2 |
Commonwealth
Estate, Inc. |
Project
Management Office |
PhP |
1,216,026.49 |
50 CD |
May 29, 2013 |
Jul 17, 2013 |
|
No activity
conducted during the month. Developer may have problem with the procurement
of the excavation permit. |
|
|
|
2.0 |
Prop. Ø100mm
Flow Meter for Marco Polo Residences (Veterans Drive, Nivel Hills, Apas, Cebu
City) |
dia.
100mm large meter assembly & interconnection |
Marco
Polo Residences |
Federal
Land, Inc. |
Project
Management Office |
PhP |
535,054.44 |
14
WD |
Mar 10, 2014 |
Mar 28, 2014 |
11% |
No
activity is conducted during this month. |
|
|
|
3.0 |
Prop. Ø100mm
Surface Mounted Bulkmeter for One Pavilion Place, (Banawa, Guadalupe, Cebu
City) |
dia.
100mm large meter assembly & interconnection |
One
Pavilion Place |
Goldpeach
Properties Corp. |
Project
Management Office |
PhP |
892,244.28 |
39
CD |
May 5, 2014 |
|
|
Materials
are availlable already. However, DPWH had denied Developer's request for
excavation permit. Developer's existing Ø 25mm pipeline source was already upgraded to Ø
50mm as a temporary source of water supply. |
|
|
|
4.0 |
Prop. Ø75mm
Surface Flow Meter for Eagle's Nest (Canduman, Mandaue City, Cebu) |
dia.75mm
large meter, large meter assembly & interconnection |
Eagle's
Nest |
Primary
Homes, Incorporated |
Project
Management Office |
PhP |
363,680.52 |
15
Working Days |
Aug 18, 2014 |
Sep 1, 2014 |
|
Developer
is on the process of procurement of materials and permit. Developer may have
a problem with the excavation permit
from the DPWH. |
|
|
|
5.0 |
Prop. Ø150mm
Surface Flow Meter for Astana Subdivision (Calawisan, Lapulapu City) |
dia.
150mm large meter, large meter assembly,
10 l.m. of Ø 150mm water distribution line & interconnection |
Astana
Subdivision |
Johndorf
Ventures Corporation |
Project
Management Office |
PhP |
|
20
Working Days |
Sep 3, 2014 |
Sep 26, 2014 |
|
Developer
is on the process of procurement of materials. |
|
|
|
6.0 |
Prop.
Ø150mm Bulk Meter Connection for
Sunrise Place Subdivision (Sitio Malinao Brgy. Agus, Lapulapu City) |
dia.
150mm large meter and assembly, 10 l.m. of Ø 150mm PVC water distribution
line |
Sunrise
Place Subdivision |
Filinvest
Land, Inc. |
Project
Management Office |
PhP |
573,409.74 |
25
Working Days |
Mar 18, 2015 |
Apr 15, 2015 |
|
Developer
is on the process of procurement of materials. |
|
|
7.0 |
Prop.
Ø75mm Surface FlowMeter for Corinthian
Residences (Andres Abellana St., Guadalupe, Cebu City) |
dia.
75mm large meter and assembly, 12 l.m. of Ø 75mm PVC water distribution line |
Corinthian
Residences |
Landtraders
World Properties Corp. |
Project
Management Office |
PhP |
532,247.12 |
9
Working Days |
May 6, 2015 |
May 16, 2015 |
|
Developer
is on the process of procurement of materials. |
|
|
8.0 |
Prop.
Ø150mm Surface FlowMeter for Priveya
Hills Subdivision (Talamban, Cebu City) |
dia.
150mm large meter and assembly, 18 l.m. of Ø 150mm PVC water distribution
line |
Priveya
Hills Subdivision |
Aboitizland,
Inc. |
Project
Management Office |
PhP |
824,138.35 |
10
Working Days |
Jun 30, 2015 |
Jul 18, 2015 |
100% |
Project
is physically completed. Awaiting for the developer's advise to activate the
completed flowmeter assembly. Also, the developer has not yet submitted the
as-built plans. |
|
|
9.0 |
Prop.
Ø100mm Surface FlowMeter for Filinvest
Cyberzone (Salinas Drive corner Geonson St., Lahug, Cebu City) |
dia.
100mm large meter and assembly & interconnection |
Filinvest
Cyberzone |
Cyberzone
Properties, Inc. |
Project
Management Office |
PhP |
430,929.12 |
20
Working Days |
Aug 4, 2015 |
Aug 31, 2015 |
|
Project
works as for the contractor is concerned is ongoing. MCWD's side of works
have already been completed. |
|
|
10.0 |
Revised Ø75mm
Surface Flow Meter for Bamboo Bay Community (Subangdaku, Mandaue City) |
dia.
75mm large meter and assembly, 55 l.m. of Ø 75mm PVC water distribution line
& interconnection |
Bamboo
Bay Community |
Contempo
Property Holdings, Inc. |
Project
Management Office |
PhP |
725,460.93 |
30
Calendar Days |
Sep 11, 2015 |
Oct 10, 2015 |
|
Flowmeter
assembly is already completed. Developer is awaiting for the permit from DPWH
so that the flowmeter will be interconnected to the mainline. |
|
|
11.0 |
Prop.
Ø75mm Surface Flow Meter for Palm
River Phase 1 (Biasong, Pooc, Talisay City) |
dia.
75mm large meter and assembly, 24 l.m.
of Ø 75mm uPVC water distribution line & interconnection |
Palm
River Phase 1 |
Deo
Homes and Property Development, Inc. |
Project
Management Office |
PhP |
548,568.09 |
9
Calendar Days |
Dec 14, 2015 |
Dec 22, 2015 |
|
Developer
is on the process of procurement of materials. |
|
|
12.0 |
Prop.
Ø75mm Surface Meter Assembly for Amaia
Steps (Plaridel Street, Mandaue City) |
dia.
75mm large meter and assembly, 10 l.m.
of Ø 75mm uPVC water distribution line & interconnection |
Amaia
Steps |
Amaia
Southern Properties, Inc. |
Project
Management Office |
PhP |
335,462.85 |
14
Calendar Days |
Mar 9, 2016 |
Mar 22, 2016 |
40% |
Flowmeter
assembly is already installed. Awaiting for the materials for the
interconnection point. |
|
|
13.0 |
Prop.
Ø150mm Surface Flow Meter for 32
Sanson (Sanson Road, Lahug, Cebu City) |
dia.
150mm large meter and assembly, 12
l.m. of Ø 150mm uPVC water distribution line & interconnection |
32
Sanson |
Rockwell
Land Corporation |
Project
Management Office |
PhP |
804,829.83 |
13
Working Days |
Mar 15, 2016 |
Apr 4, 2016 |
|
Developer
is on the process of procurement of materials. |
|
|
14.0 |
Prop.
Ø150mm Surface Flow Meter for Sundance
Condominium (Banawa, Cebu City) |
dia.
150mm large meter and assembly, 12
l.m. of Ø 150mm uPVC water distribution line & interconnection |
Sundance
Condominium |
Worldwide
Steel Group, Inc. |
Project
Management Office |
PhP |
549,924.60 |
13
Working Days |
Mar 15, 2016 |
Apr 4, 2016 |
|
Flowmeter
size is being revised by ED. |
|
|
15.0 |
Prop.
Ø100mm Surface Flow Meter for Solinea
(Lazuli) (Cebu Business Park, Brgy. Hipodromo, Cebu City) |
dia.
100mm large meter and assembly, 3 l.m.
of Ø 100mm uPVC water distribution line & interconnection |
Solinea |
-No
MOA yet- |
Project
Management Office |
PhP |
619,188.80 |
15
Working Days |
Jun 1, 2016 |
Jun 23, 2016 |
|
MOA
is on process. Developer is on the process of procurement of materials. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section IV. Ongoing Subdivision/Hotel/Condo Water System Projects 10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|