1.  INFRASTRUCTURE PROJECTS
Name of Project  Location Contractor Final Project Cost Date Completed Remarks
    1.0 Proposed Pipelines Expansion under Hydraulic Area 1 Package 2  Consolacion & Liloan, Cebu JFAP Construction Php   Sep 21, 2016 Final inspection for this completed project was conducted on September 21, 2016. Final project cost is yet to be calculated due to the pending variation order which is on process. Contractor is yet to submit the as-built drawings.
    2.0 Site Development at MCWD Property in Cordova (under Supplemental Agreement to the Mactan Septage Management Service Contract) Brgy. San Miguel, Cordova, Cebu Envirokonsult Equipment Services, Incorporated PhP 818,315.86 Aug 22, 2016 A certificate of project completion had been issued to the Contractor.
    3.0 Proposed Pipelines Expansion under Hydraulic Area 1 Package 7 M.L. Quezon Avenue and Babag, Lapulapu City JFAP Construction Php   Aug 24, 2016 Project is physically completed. Final project cost is yet to be calculated due to the pending variation order which is on process. Contractor is yet to submit the as-built drawings.
    4.0 Rehabilitation of Pipe Support at Old Bridge, Mandaue-Mactan, Cebu Old Mandaue-Mactan Bridge, Cebu Jegma Construction Php 5,965,453.64 Aug 17, 2016 Awaiting for the Contractor to submit the as-built drawings.
    5.0 Proposed Ø200mm x 454.0LM DI Rehabilitation Project at Pulpogan, Consolacion Pulpogan, Consolacion FDRCon Co., Inc. Php 4,998,043.58 May 31, 2016  
    6.0 Construction of Proposed Man-1 Pumping Station for the MCWD In-House Water Sourcing Program Sitio Pilit, Brgy. Cabancalan, Mandaue City, Cebu Dakay Construction and Development Corporation Php 5,739,002.00 May 6, 2016 A Certificate of Project Completion had been issued to the Contractor.
    7.0 Prop. DI Rehabilitation Project at Pajac, Lapulapu City Brgy. Pajac, Lapulapu City Rex E. Morales Construction Php 6,585,826.37 Mar 27, 2016 Awaiting for the Contractor to submit the as-built drawings.
    8.0 Prop. Pipeline Expansion for Cabancalan Bulk Water Supply Brgy. Cabancalan, Mandaue City Felman Builders and Contractors Php 16,744,730.61 Feb 29, 2016 Joint final inspection was conducted on February 29, 2016. Contractor has yet to submit the as-built drawings.
    9.0 Proposed Pipelines Expansion under Hydraulic Area 1 Package 4  Mandaue City and Lapulapu City, Cebu Geo Transport & Construction, Inc. Php 58,173,934.80 Feb 15, 2016 Awaiting for the Contractor to submit the as-built drawings.
2. GOODS AND SERVICES
Name of Project  Location Supplier Final Project Cost Date Completed Remarks
    1.0 MCWD Septage Management Service Contract (Phase I - Mactan Septage Management Service) Brgy. San Miguel, Cordova, Cebu Envirokonsult Equipment Services, Incorporated PhP 800.00 / m3 Aug 22, 2016 The project had been turned-over to the Operations Group. The Operations Group as approved by the BOD had determined August 22, 2016 as the Day 1 of operation.
3. JOINT VENTURE PROJECTS
Name of Project  Location JV Partner Final Project Cost Date Completed Remarks
               
4. SUBDIVISION/HOTEL/CONDO WATER SYSTEM PROJECTS
4. 1 WATER SYSTEM
Name of Project  Location Owner/Developer Final Project Cost Date Completed Remarks
    1.0 Prop. Water Distribution Systems for City Homes - Mandaue  J.S. Alinsug St., Mandaue City, Cebu Grand Land, Inc. Php          870,061.25 Jun 24, 2016  
    2.0 Prop. Ø100mm x 373.0 lm UPVC Expansion Project for Colorado Homes Dos Brgy. Jubay, Liloan, Cebu Commonwealth Estate, Inc. Php       1,640,244.69 Jun 1, 2016  
    3.0 Prop. Water Distribution System for Villa Azalea Subdivision Phase 2 Brgy. Cotcot, Liloan, Cebu Mega Crown Realty and Development Corp. Php       5,964,029.61 Feb 17, 2016  
    4.0 Prop. Water Sytem for Graceland 1 & Graceland Annex Subdivision Brgy. Buaya, Mactan, Lapulapu City Kaiser Urban Development Corp. Php          858,046.50 Mar 22, 2016  
    5.0 Prop. PVC Water Distribution System for Kaiser Townhouse II Estancia, Mandaue City Kaiser Urban Development Corp. Php       1,687,773.35 Mar 11, 2016  
       Section V.      Projects Completed in 2016         12
4. 2 FLOWMETER ASSEMBLY AND VAULT                
  Name of Project  Location Owner/Developer Final Project Cost Date Completed Remarks
    1.0 Prop. Ø75mm  Surface FlowMeter for Park Point Residences Ayala Business Park, Cebu City Ayala Land, Inc. Php          545,657.97 Aug 4, 2016  
    2.0 Prop. Ø150mm  Surface Flow Meter for Horizons 101 Condominium  Gen. Maxilom Avenue, Cebu City Taft Property Venture Development Corporation Php          606,185.88 Jun 23, 2016  
    3.0 Prop. Ø150mm  Surface FlowMeter for Eastland Yati Village (Phase 1-3) Yati, Liloan, Cebu Eastland Property Ventures, Inc. Php       1,618,076.10 Jun 17, 2016  
    4.0 Prop. Ø75mm  Surface FlowMeter for San Pio Subdivision Dumlog, Talisay City, Cebu Justice, Peace & Integrity of Creation - Integrated Development Center, Inc. (JPIC-IDC) Php          527,063.13 Jun 16, 2016  
    5.0 Prop. Ø75mm Flowmeter Assembly for Midori  A.S. Fortuna Avenue, Mandaue City Cebu Landmasters, Inc. Php          439,333.20   Awaiting for the hydrotesting and disinfection result, and as-built plan. This project is undertaken by PDD.
    6.0 Prop. Ø75mm Surface Flow Meter for Mabolo Garden Flats Tres Borces St., Mabolo, Cebu City Primary Homes, Incorporated Php          334,970.76   Project is physically completed. However, the Developer has yet to pay for the guarantee deposit. Thus, the project is still awaiting for the final inspection.
    7.0 Prop. Ø100mm  Surface FlowMeter for Almiya Subdivision  Brgy. Canduman, Mandaue City, Cebu Aboitizland, Inc. Php          378,540.42 Jan 19, 2016 Final inspection was conducted on January 19, 2016.
    8.0 Prop. Ø100mm  Surface FlowMeter for Mivesa Garden Residences Salinas Drive Extension, Brgy. Lahug, Cebu City Cebu Landmasters, Inc. Php          793,185.53 Jan 18, 2016 Final inspection was conducted on January 18, 2016. Awaiting for the Developer to submit the as-built drawings.
       Section V.      Projects Completed in 2016         13 11