1.  INFRASTRUCTURE PROJECTS
Name of Project  Location Contractor Final Project Cost Date Completed Remarks
    1.0 Proposed Pipelines Expansion under Hydraulic Area 1 Package 7 M.L. Quezon Avenue and Babag, Lapulapu City JFAP Construction Php     Project is physically completed. Final project cost is yet to be calculated due to the pending variation order.
    2.0 Proposed Ø200mm x 454.0LM DI Rehabilitation Project at Pulpogan, Consolacion Pulpogan, Consolacion FDRCon Co., Inc. Php 4,998,043.58 May 31, 2016 Contractor has submitted the as-built plan. It is on process for approval.
    3.0 Prop. DI Rehabilitation Project at Pajac, Lapulapu City Brgy. Pajac, Lapulapu City Rex E. Morales Construction Php 6,585,826.37 Mar 27, 2016 Awaiting for the Contractor to submit the as-built drawings.
    4.0 Prop. Pipeline Expansion for Cabancalan Bulk Water Supply Brgy. Cabancalan, Mandaue City Felman Builders and Contractors Php 16,744,730.61 Feb 29, 2016 Joint final inspection was conducted on February 29, 2016. Contractor has yet to submit the as-built drawings.
2. SUPPLY AND DELIVERY OF GOODS
Name of Project  Location Supplier Final Project Cost Date Completed Remarks
               
3. JOINT VENTURE PROJECTS
Name of Project  Location JV Partner Final Project Cost Date Completed Remarks
    2.0 Construction of Proposed Man-1 Pumping Station for the MCWD In-House Water Sourcing Program Sitio Pilit, Brgy. Cabancalan, Mandaue City, Cebu Dakay Construction and Development Corporation Php 5,739,002.00 May 6, 2016 The Contractor has yet to submit the As-Built Drawings, Operation and Maintenance Manual, and the Defects Liability Bond.
4. SUBDIVISION/HOTEL/CONDO WATER SYSTEM PROJECTS
4. 1 WATER SYSTEM
Name of Project  Location Owner/Developer Final Project Cost Date Completed Remarks
    1.0 Prop. Water Distribution Systems for City Homes - Mandaue  J.S. Alinsug St., Mandaue City, Cebu Grand Land, Inc. Php          870,061.25 Jun 24, 2016  
    2.0 Prop. Ø100mm x 373.0 lm UPVC Expansion Project for Colorado Homes Dos Brgy. Jubay, Liloan, Cebu Commonwealth Estate, Inc. Php       1,640,244.69 Jun 1, 2016  
    3.0 Prop. Water Distribution System for Villa Azalea Subdivision Phase 2 Brgy. Cotcot, Liloan, Cebu Mega Crown Realty and Development Corp. Php       5,964,029.61 Feb 17, 2016 Awaiting for the Developer to submit the as-built drawing.
    4.0 Prop. Water Sytem for Graceland 1 & Graceland Annex Subdivision Brgy. Buaya, Mactan, Lapulapu City Kaiser Urban Development Corp. Php          858,046.50 Mar 22, 2016  
    5.0 Prop. PVC Water Distribution System for Kaiser Townhouse II Estancia, Mandaue City Kaiser Urban Development Corp. Php       1,687,773.35 Mar 11, 2016  
       Section V.      Projects Completed in 2016         12
4. 2 FLOWMETER ASSEMBLY AND VAULT                
  Name of Project  Location Owner/Developer Final Project Cost Date Completed Remarks
    1.0 Prop. Ø150mm  Surface Flow Meter for Horizons 101 Condominium  Gen. Maxilom Avenue, Cebu City Taft Property Venture Development Corporation Php          606,185.88 Jun 23, 2016  
    2.0 Prop. Ø150mm  Surface FlowMeter for Eastland Yati Village (Phase 1-3) Yati, Liloan, Cebu Eastland Property Ventures, Inc. Php       1,618,076.10 Jun 17, 2016  
    3.0 Prop. Ø75mm  Surface FlowMeter for San Pio Subdivision Dumlog, Talisay City, Cebu Justice, Peace & Integrity of Creation - Integrated Development Center, Inc. (JPIC-IDC) Php          527,063.13 Jun 16, 2016  
    4.0 Prop. Ø75mm Flowmeter Assembly for Midori  A.S. Fortuna Avenue, Mandaue City Cebu Landmasters, Inc. Php          439,333.20   Awaiting for the hydrotesting and disinfection result, and as-built plan.
    5.0 Prop. Ø75mm Surface Flow Meter for Mabolo Garden Flats Tres Borces St., Mabolo, Cebu City Primary Homes, Incorporated Php          334,970.76   Project is physically completed. However, the Developer has yet to pay for the guarantee deposit. Thus, the project is still awaiting for the final inspection.
    6.0 Prop. Ø100mm  Surface FlowMeter for Almiya Subdivision  Brgy. Canduman, Mandaue City, Cebu Aboitizland, Inc. Php          378,540.42 Jan 19, 2016 Final inspection was conducted on January 19, 2016.
    7.0 Prop. Ø100mm  Surface FlowMeter for Mivesa Garden Residences Salinas Drive Extension, Brgy. Lahug, Cebu City Cebu Landmasters, Inc. Php          793,185.53 Jan 18, 2016 Final inspection was conducted on January 18, 2016. Awaiting for the Developer to submit the as-built drawings.
       Section V.      Projects Completed in 2016         13 11