Name of Project  Brief Description of the Project Subdivision/Hotel/Condo Name Developer / Owner MCWD Supervising Unit Project Amount Project Duration Date Started Target Completion Date Accomplish-          ment                             To Date Remarks Previous Month's Remarks
1. Water System                  
1.0 Prop. Water Distribution System for EastGate Subdivision (Matumbo, Pusok, Lapulapu) 49.54 LM x 75mm dia EastGate Subdivision Urban Enclaves Inc. Project Management Office PhP      514,061.34 11 CD Jul 15, 2011 Jul 26, 2011 20.00% Upon site inspection by MCWD inspector, developer has installed individual service connections directly to the MCWD stub-out outside of the subdivision. It is suggesting a possibility that the contractor may cancel the project. Upon site inspection by MCWD inspector, developer has installed individual service connections directly to the MCWD stub-out outside of the subdivision. It is suggesting a possibility that the contractor may cancel the project.
2.0 Prop. PVC Water Distribution System for Amara Subdivision - Phase 6 (Catarman, Liloan, Cebu) pu Amara Subdivision Cebu Holdings, Inc. Project Management Office PhP   92 CD May 15, 2012 Aug 14, 2012 96.00% Contractor is on the process of purchasing the handhole cover and AV/AR head. Contractor is on the process of purchasing the handhole cover and AV/AR head.
3.0 Prop. Rerouting of PVC Water Distribution Line for Amara Subdivision (Catarman, Liloan, Cebu)  1,650 LM x 150mm dia. Amara Subdivision Cebu Holdings, Inc. Project Management Office PhP   92 CD May 15, 2012 Aug 14, 2012 98.00% The only remaining work is the disinfection of a portion of the water system of the subdivision at phase 3b. The only remaining work is the disinfection of a portion of the water system of the subdivision at phase 3b.
4.0 Prop. Water Distribution System for Pueblo De Oro Communities (Sitio Judas Belt, Babag II, Lapu-lapu City) 6,920 LM x 75mm dia., 2,071 LM x 100mm dia., 1,286 LM x 150mm dia., 49 LM x 200mm dia., 151 LM x 250mm dia. Pueblo De Oro Communities (Horizon, La Aldea Del Mar, and Parkplace) Pueblo De Oro Development Corp. Project Management Office PhP   22,980,152.33       37.00% Developer is implementing the pipelaying works on this project area by area. Three areas have already been turned-over to MCWD. The fourth area to be turned-over has passed the potability and is ready for commissioning. Developer is implementing the pipelaying works on this project area by area. Three areas have already been turned-over to MCWD. The fourth area to be turned-over has passed the potability and is ready for commissioning.
5.0 Prop. PVC Water Distribution System for Kaiser Townhouse II 510 LM x 100mm dia. PVC and 75mm dia. PVC water distribution line Kaiser Townhouse II Kaiser Urban Development Corp. Project Management Office PhP      1,687,773.35   Jun 24, 2013   80.00% Remaining works are hydrotesting, disinfection and interconnection. Remaining works are hydrotesting, disinfection and interconnection.
6.0 Prop. Water Distribution Systems for Mactan Plains Subdivision 114 LM x 100mm dia. PVC and 810 LM 75mm dia. PVC water distribution line Mactan Plains Subdivision Pacific Land Ventures and Property Development, Inc. Project Management Office PhP       1,617,764.80   Jun 25, 2013     Developer is on the process of procurement of materials. Developer is on the process of procurement of materials.
7.0 Prop. Water System Design for Goldmine Residences (Bangkal-Mahayahay-Soong, Lapulapu City) 236 LM x 150mm dia. PVC, 32 LM 100mm dia. PVC, 152 LM 75mm dia. PVC, 617 LM 50mm dia. PVC Goldmine Residences Heritage Supreme Land Developer, Inc. Project Management Office PhP       3,215,481.65   Oct 14, 2013     Developer is awaiting for the well to be constructed by EWRD-KC. After the well, the installation of the interconnecting pipeline will have to be done by MCWD before the water system of the subdivision will be implemented. Developer is awaiting for the well to be constructed by EWRD-KC. After the well, the installation of the interconnecting pipeline will have to be done by MCWD before the water system of the subdivision will be implemented.
8.0 Prop. Water Distribution Systems for City Homes - Mandaue (J.S. Alinsug St., Mandaue City, Cebu) 42 LM 75mm dia. PVC, 218 LM 50mm dia. PVC City Homes Mandaue Grand Land, Inc. Project Management Office PhP          870,061.25   Oct 23, 2013   85.00% Remaining works are hydrotesting, flushing and disinfection. Remaining works are hydrotesting, flushing and disinfection.
9.0 Prop. PVC Water Distribution System for South Glendale Subdivision (San Isidro Road, San Isidro, Talisay City, Cebu) 168 LM 75mm dia. PVC, 324 LM 50mm dia. PVC South Glendale Subdivision Primary Homes, Inc. Project Management Office PhP       1,247,851.98 49 CD May 22, 2014   61.50% Pipelaying works is ongoing. Pipelaying works is ongoing.
10.0 Prop. Water Sytem for Graceland 1 & Graceland Annex Subdivision (Brgy. Buaya, Mactan, Lapulapu City) 39 lm x 100mm dia PVC, 29 lm x 50mm dia PVC Graceland 1 and Graceland Annex Subdivision Kaiser Urban Development Corp. Project Management Office PhP         858,046.50 11 Working Days Jul 7, 2014 Jul 21, 2014 40.00% Pipelaying is ongoing. Developer isawaiting for the materials for the stub-out. Pipelaying is ongoing.
11.0 Prop. Water Distribution Lines for Colorado Dos ( Brgy. Cotcot, Liloan, Cebu) 338 lm x 100mm dia PVC, 570 lm x 75mm dia PVC, and 157 lm x 50mm dia PVC Colorado Dos Subdivision Primary Homes, Incorporated Project Management Office PhP   2,813,740.02 80 Working Days Aug 8, 2014 Oct 26, 2014 40.00% Pipelaying is ongoing. Pipelaying is ongoing.
12.0 Prop. Water System Design for South Covina Subdivision (Brgy. Dumlog, Talisay City, Cebu) 42 lm x 100mm dia PVC, 110 lm x 75mm dia PVC, and 346 lm x 50mm dia PVC South Covina Subdivision Athecor Development Corporation Project Management Office PhP   1,177,338.75 71 Working Days Sep 18, 2014 Dec 17, 2014   Developer is on the process of procurement of materials. Developer is on the process of procurement of materials.
13.0 Prop. Water Distribution System for Peninsula Subdivision (Sudtungan Road, Brgy. Basak, Lapulapu City) 42 lm x 100mm dia PVC, 110 lm x 75mm dia PVC, and 346 lm x 50mm dia PVC Peninsula Place Subdivision Peninsula Resort Corporation Project Management Office PhP   1,196,027.58 52 Calendar Days Oct 1, 2014 Nov 21, 2014   Developer is on the process of procurement of materials and excavation permit. Developer is on the process of procurement of materials and excavation permit.
Section IV.      Ongoing Subdivision/Hotel/Condo Water System Projects     10                                                                  
Name of Project  Brief Description of the Project Subdivision/Hotel/Condo Name Developer / Owner MCWD Supervising Unit Project Amount Project Duration Date Started Target Completion Date Accomplish-          ment                             To Date Remarks
2. Flowmeter Assembly and Vault                  
1.0 Prop. Ø100mm Flowmeter Enclosed in Reinforced Concrete Vault for Alegria Palms Subdivision 2 (Brgy. Gabi, Cordova, Cebu) dia.100mm flowmeter, construction of reinforced concrete vault & interconnection Alegria Palms Subdivision 2 Commonwealth Estate, Inc. Project Management Office PhP   1,216,026.49 50 CD May 29, 2013 Jul 17, 2013   No activity conducted during the month. No activity conducted during the month.
2.0 Prop. Ø100mm Flow Meter for Andalucia Crest Subdivision (Brgy. Gabi, Cordova, Cebu) dia. 100mm large meter assembly & interconnection Andalucia Crest Subdivision Myvan Properties & Development, Inc. Project Management Office PhP      464,612.05 9 WD Dec 16, 2013 Dec 30, 2013 38% Surface flowmeter is already installed. The developer is awaiting for the excavation permit for the interconnection tapping point. Surface flowmeter is already installed. The developer is awaiting for the excavation permit for the interconnection tapping point.
3.0 Prop. Ø100mm Flow Meter for Marco Polo Residences (Veterans Drive, Nivel Hills, Apas, Cebu City) dia. 100mm large meter assembly & interconnection Marco Polo Residences Federal Land, Inc. Project Management Office PhP      535,054.44 14 WD Mar 10, 2014 Mar 28, 2014   Developer is on the process of procurement of materials. Developer is on the process of procurement of materials.
4.0 Prop. Ø150mm Surface Flow Meter for Monterrazas Subd. (Brgy. Guadalupe, Cebu City) dia. 150mm large meter assembly & interconnection Monterrazas Subdivision GENVI Development Corp. Project Management Office PhP      481,029.27 9 WD     98.00% The hydrotesting of the installed pipeline and flowmeter assembly has been completed. The Developer plans to schedule the disinfection and interconnection activities by January 2015. The hydrotesting of the installed pipeline and flowmeter assembly has been completed. The Developer plans to schedule the disinfection and interconnection activities by January 2015.
5.0 Prop. Ø100mm Surface Mounted Bulkmeter for One Pavilion Place, (Banawa, Guadalupe, Cebu City) dia. 100mm large meter assembly & interconnection One Pavilion Place Goldpeach Properties Corp. Project Management Office PhP      892,244.28 39 CD May 5, 2014     Materials are availlable already. However, DPWH had denied their request for excavation permit. Developer is processing on their request to MCWD that their existing Ø 25mm pipeline be upgraded to Ø 50mm. Materials are availlable already. However, DPWH had denied their request for excavation permit. Developer is processing on their request to MCWD that their existing Ø 25mm pipeline be upgraded to Ø 50mm.
6.0 Prop. Ø75mm Surface Flow Meter for Mabolo Garden Flats (Tres Borces St., Mabolo, Cebu City) dia.75mm large meter, large meter assembly & interconnection Mabolo Garden Flats Primary Homes, Incorporated Project Management Office PhP      334,970.76 N.A. Aug 18, 2014 N.A.   Developer is on the process of procurement of materials and permits. Developer is on the process of procurement of materials and permits.
7.0 Prop. Ø75mm Surface Flow Meter for Eagle's Nest (Canduman, Mandaue City, Cebu) dia.75mm large meter, large meter assembly & interconnection Eagle's Nest Primary Homes, Incorporated Project Management Office PhP      363,680.52 15 Working Days Aug 18, 2014 Sep 1, 2014   Developer is on the process of procurement of materials. Developer is on the process of procurement of materials.
8.0 Prop. Ø100mm Surface Flow Meter for Grand Residences (Tower 1 and 2) (Archbishop Reyes Ave., Cebu City) dia. 100mm large meter, large meter assembly,  78 l.m. of Ø 100mm water distribution line & interconnection Grand Residences (Tower 1 and 2) Grand Land, Inc. Project Management Office PhP      474,041.64 14 Working Days Sep 1, 2014 Sep 16, 2014   Developer is on the process of procurement of materials. Developer is on the process of procurement of materials.
9.0 Prop. Ø150mm Surface Flow Meter for Astana Subdivision (Calawisan, Lapulapu City) dia. 150mm large meter, large meter assembly,  10 l.m. of Ø 150mm water distribution line & interconnection Astana Subdivision Johndorf Ventures Corporation Project Management Office PhP      564,233.88 20 Working Days Sep 3, 2014 Sep 26, 2014   Developer is on the process of procurement of materials. Developer is on the process of procurement of materials.
10.0 Prop. Ø150mm  and Ø100mm Bulk Meter Connections for Norkis Cyberpark (A.S. Fortuna and L. Jaime Sts., Mandaue City) dia. 150mm large meter and assembly,  18 l.m. of Ø 150mm uPVC water distribution line; dia. 100mm large meter and assembly,  18 l.m. of Ø 100mm uPVC water distribution line Norkis Cyberpark Norkis Cyberpark, Inc. Project Management Office PhP   1,055,960.34 25 Working Days Oct 8, 2014     Developer is on the process of procurement of materials. Developer is on the process of procurement of materials.
11.0 Prop. Ø150mm  Bulk Meter Connection for Sunrise Place Subdivision (Sitio Malinao Brgy. Agus, Lapulapu City) dia. 150mm large meter and assembly, 10 l.m. of Ø 150mm PVC water distribution line Sunrise Place Subdivision Filinvest Land, Inc. Project Management Office PhP      573,409.74 25 Working Days Mar 18, 2015 Apr 15, 2015   A Pre-Construction meeting was conducted on March 18, 2015 Developer is on the process of procurement of materials.
12.0 Prop. Ø100mm  Surface FlowMeter for Almiya Subdivision (Brgy. Canduman, Mandaue City, Cebu) dia. 100mm large meter and assembly, 7 l.m. of Ø 100mm PVC water distribution line Almiya Subdivision Aboitizland, Inc. Project Management Office PhP      378,540.42 9
Working Days
Mar 26, 2015 Apr 5, 2015   A Pre-Construction meeting was conducted on March 26, 2015 Developer is on the process of procurement of materials.