Name of Project  Contractor  Contract Amount                           Date of Contract Signing or Notice to Proceed Delivery Period  End of Delivery Period Revised Delivery Period % Delivered Remarks
Previous This Month  To Date
At Award Present
                       
1.0 MCWD Bulk Water Supply Contract (Compostela-Liloan-Consolacion Injection Points) Cebu Manila Water Development Inc. Php 24.59 / cu.m. Php 24.59 / cu.m. 18 Dec 2013 6 months from the Contract Signing June 17, 2014   NA NA NA CMWD had proposed a temporary connection scheme for the 3 drop-off points and a temporary Ø1000mm injection point at Consolacion which the BOD had approved. CMWD's target to inject its water into MCWD's pipeline system at the latter part of December 2014 did not materialize. Contractor's promise to construct the permanent meter vaults by January 2015 was not materialized. Contractor has not yet completed the design for the same. Following the approval by LWUA of the MCWD's request for Water Rate Adjustment, the MCWD has notified CMWD that the effective Day 1 of delivery for this bulk supply contract is December __, 2014. 
                     
          The Terms of Reference has Prefatory Condition that the Contract is binding and enforceable only upon approval of the Water Rate Adjustment requested by MCWD with the Local Water Utilities Administration.       CMWD had proposed a temporary connection scheme for the 3 drop-off points and a temporary Ø1000mm injection point at Consolacion which the BOD had approved. CMWD's target to inject its water into MCWD's pipeline system at the latter part of December 2014 did not materialize. Contractor's promise to construct the permanent meter vaults by January 2015 was not materialized. Contractor has not yet completed the design for the same.
                         
                             
             Section II.  Ongoing Supply and Installation of Goods       5