Name of
Project |
Brief Description of
the Project |
Subdivision/Hotel/Condo
Name |
Developer / Owner |
MCWD Supervising Unit |
Project
Amount |
Project Duration |
Date Started |
Target Completion Date |
Accomplish- ment To Date |
Remarks |
|
Previous Month's
Remarks |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Water System |
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Prop. Water Distribution System
for EastGate Subdivision (Matumbo, Pusok, Lapulapu) |
49.54 LM x
75mm dia |
EastGate Subdivision |
Urban Enclaves Inc. |
Project Management Office |
PhP |
514,061.34 |
11 CD |
Jul 15, 2011 |
Jul 26, 2011 |
20.00% |
Upon site inspection by MCWD
inspector, developer has installed individual service connections directly to
the MCWD stub-out outside of the subdivision. It is suggesting a possibility
that the contractor may cancel the project. |
|
Upon site inspection by MCWD inspector, developer has
installed individual service connections directly to the MCWD stub-out
outside of the subdivision. It is suggesting a possibility that the
contractor may cancel the project. |
|
|
|
2.0 |
Prop. PVC Water Distribution
System for Amara Subdivision - Phase 6 (Catarman, Liloan, Cebu) |
pu |
Amara Subdivision |
Cebu Holdings, Inc. |
Project Management Office |
PhP |
|
92 CD |
May 15, 2012 |
Aug 14, 2012 |
96.00% |
Contractor is on the process of
purchasing the handhole cover and AV/AR head. |
|
Contractor is on the process of
purchasing the handhole cover and AV/AR head. |
|
|
|
3.0 |
Prop. Rerouting
of PVC Water Distribution Line for Amara Subdivision (Catarman, Liloan, Cebu) |
1,650 LM x 150mm dia. |
Amara
Subdivision |
Cebu Holdings, Inc. |
Project
Management Office |
PhP |
|
92 CD |
May 15, 2012 |
Aug 14, 2012 |
98.00% |
The only
remaining work is the disinfection of a portion of the water system of the
subdivision at phase 3b. |
|
The only
remaining work is the disinfection of a portion of the water system of the
subdivision at phase 3b. |
|
|
|
4.0 |
Prop. Water Distribution System
for Pueblo De Oro Communities (Sitio Judas Belt, Babag II, Lapu-lapu City) |
6,920 LM x
75mm dia., 2,071 LM x 100mm dia., 1,286 LM x 150mm dia., 49 LM x 200mm dia.,
151 LM x 250mm dia. |
Pueblo De Oro Communities
(Horizon, La Aldea Del Mar, and Parkplace) |
Pueblo De Oro Development Corp. |
Project
Management Office |
PhP |
############ |
|
|
|
37.00% |
Developer is implementing the
pipelaying works on this project area by area. Three areas have already been
turned-over to MCWD. The fourth area to be turned-over has passed the
potability and is ready for commissioning. |
|
Developer is implementing the
pipelaying works on this project area by area. Three areas have already been
turned-over to MCWD. The fourth area to be turned-over has passed the
potability and is ready for commissioning. |
|
|
|
5.0 |
Prop. PVC Water
Distribution System for Kaiser Townhouse II |
510
LM x 100mm dia. PVC and 75mm dia. PVC water distribution line |
Kaiser
Townhouse II |
Kaiser Urban
Development Corp. |
Project
Management Office |
PhP |
1,687,773.35 |
|
Jun 24, 2013 |
|
80.00% |
Remaining works
are hydrotesting, disinfection and interconnection. |
|
Remaining works
are hydrotesting, disinfection and interconnection. |
|
|
6.0 |
Prop. Water
Distribution Systems for Mactan Plains Subdivision |
114
LM x 100mm dia. PVC and 810 LM 75mm dia. PVC water distribution line |
Mactan Plains
Subdivision |
Pacific Land
Ventures and Property Development, Inc. |
Project
Management Office |
PhP |
1,617,764.80 |
|
Jun 25, 2013 |
|
|
Developer is on
the process of procurement of materials. |
|
Developer is on
the process of procurement of materials. |
|
|
7.0 |
Prop. Water
System Design for Goldmine Residences (Bangkal-Mahayahay-Soong, Lapulapu
City) |
236
LM x 150mm dia. PVC, 32 LM 100mm dia. PVC, 152 LM 75mm dia. PVC, 617 LM 50mm
dia. PVC |
Goldmine
Residences |
Heritage Supreme
Land Developer, Inc. |
Project
Management Office |
PhP |
3,215,481.65 |
|
Oct 14, 2013 |
|
|
Developer is
awaiting for the well to be constructed by EWRD-KC. After the well, the
installation of the interconnecting pipeline will have to be done by MCWD
before the water system of the subdivision will be implemented. |
|
Developer is
awaiting for the well to be constructed by EWRD-KC. After the well, the
installation of the interconnecting pipeline will have to be done by MCWD
before the water system of the subdivision will be implemented. |
|
|
8.0 |
Prop. Water
Distribution Systems for City Homes - Mandaue (J.S. Alinsug St., Mandaue
City, Cebu) |
42
LM 75mm dia. PVC, 218 LM 50mm dia. PVC |
City Homes
Mandaue |
Grand Land, Inc. |
Project
Management Office |
PhP |
870,061.25 |
|
Oct 23, 2013 |
|
85.00% |
Remaining works
are hydrotesting, flushing and disinfection. |
|
Remaining works
are hydrotesting, flushing and disinfection. |
|
|
9.0 |
Prop. PVC Water
Distribution System for South Glendale Subdivision (San Isidro Road, San
Isidro, Talisay City, Cebu) |
168
LM 75mm dia. PVC, 324 LM 50mm dia. PVC |
South Glendale
Subdivision |
Primary Homes,
Inc. |
Project
Management Office |
PhP |
1,247,851.98 |
49 CD |
May 22, 2014 |
|
67.00% |
Pipelaying
works is completed. Remaining works are: installation of BOV, AV/AR,
stub-outs and concrete restoration. |
|
Pipelaying
works is ongoing. |
|
|
10.0 |
Prop. Water
Sytem for Graceland 1 & Graceland Annex Subdivision (Brgy. Buaya, Mactan,
Lapulapu City) |
39
lm x 100mm dia PVC, 29 lm x 50mm dia PVC |
Graceland 1 and
Graceland Annex Subdivision |
Kaiser Urban
Development Corp. |
Project
Management Office |
PhP |
858,046.50 |
11 Working Days |
Jul 7, 2014 |
Jul 21, 2014 |
40.00% |
Pipelaying is
ongoing. |
|
Pipelaying is
ongoing. |
|
|
11.0 |
Prop. Water
Distribution Lines for Colorado Dos ( Brgy. Cotcot, Liloan, Cebu) |
338
lm x 100mm dia PVC, 570 lm x 75mm dia PVC, and 157 lm x 50mm dia PVC |
Colorado Dos
Subdivision |
Primary Homes,
Incorporated |
Project
Management Office |
PhP |
2,813,740.02 |
80 Working Days |
Aug 8, 2014 |
Oct
26, 2014 |
40.00% |
Pipelaying is
ongoing. |
|
Pipelaying is ongoing. |
|
|
12.0 |
Prop. Water
System Design for South Covina Subdivision (Brgy. Dumlog, Talisay City, Cebu) |
42
lm x 100mm dia PVC, 110 lm x 75mm dia PVC, and 346 lm x 50mm dia PVC |
South Covina
Subdivision |
Athecor
Development Corporation |
Project
Management Office |
PhP |
1,177,338.75 |
71 Working Days |
Sep 18, 2014 |
Dec
17, 2014 |
|
Developer is on the
process of procurement of materials. |
|
Developer is on the process of
procurement of materials. |
|
|
13.0 |
Prop. Water
Distribution System for Peninsula Subdivision (Sudtungan Road, Brgy. Basak,
Lapulapu City) |
42
lm x 100mm dia PVC, 110 lm x 75mm dia PVC, and 346 lm x 50mm dia PVC |
Peninsula Place
Subdivision |
Peninsula Resort
Corporation |
Project
Management Office |
PhP |
1,196,027.58 |
52 Calendar Days |
Oct 1, 2014 |
Nov
21, 2014 |
|
Developer is on the
process of procurement of materials and excavation permit. |
|
Developer is on the process of
procurement of materials and excavation permit. |
|
|
14.0 |
Prop. Water
Distribution System for Rose Pike Subdivision (Forest Hills, Kalubihan,
Banawa, Brgy. Guadalupe, Cebu City) |
228
lm x 50mm dia PVC |
Rose Pike
Subdivision |
F.S. Baltazar
Builders |
Project
Management Office |
PhP |
1,415,707.20 |
45 Calendar Days |
Feb 17, 2015 |
Apr
2, 2015 |
|
Developer is on the
process of procurement of materials and excavation permit. |
|
Developer is on the process of
procurement of materials and excavation permit. |
|
|
15.0 |
Prop. Water
Distribution System for Villa Azalea Subdivision Phase 2 |
270
lm x 200mm dia PVC, 222 lm x 150mm dia PVC, 612 lm x 100mm dia PVC, 438 lm x
75mm dia PVC, and 492 lm x 50mm dia PVC |
Villa
Azalea Subdivision Phase 2 |
Mega
Crown Realty and Development Corp. |
Project
Management Office |
PhP |
5,964,029.61 |
225
Calendar Days |
Apr 8, 2015 |
Nov 18, 2015 |
|
A
Pre-Construction meeting was conducted on April 8, 2015 |
|
A
Pre-Construction meeting was conducted on March 26, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section IV. Ongoing Subdivision/Hotel/Condo Water System Projects 10 |
|
|
Name of Project |
Brief Description of
the Project |
Subdivision/Hotel/Condo
Name |
Developer / Owner |
MCWD Supervising Unit |
Project
Amount |
Project Duration |
Date Started |
Target Completion Date |
Accomplish- ment To Date |
Remarks |
|
|
|
|
|
|
|
|
|
2. Flowmeter Assembly
and Vault |
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Prop. Ø100mm Flowmeter Enclosed
in Reinforced Concrete Vault for Alegria Palms Subdivision 2 (Brgy. Gabi,
Cordova, Cebu) |
dia.100mm
flowmeter, construction of reinforced concrete vault & interconnection |
Alegria
Palms Subdivision 2 |
Commonwealth
Estate, Inc. |
Project
Management Office |
PhP |
1,216,026.49 |
50 CD |
May 29, 2013 |
Jul 17, 2013 |
|
No activity
conducted during the month. |
|
No activity conducted during
the month. |
|
|
|
2.0 |
Prop. Ø100mm
Flow Meter for Andalucia Crest Subdivision (Brgy. Gabi, Cordova, Cebu) |
dia.
100mm large meter assembly & interconnection |
Andalucia
Crest Subdivision |
Myvan
Properties & Development, Inc. |
Project
Management Office |
PhP |
464,612.05 |
9
WD |
Dec 16, 2013 |
Dec 30, 2013 |
98% |
Remaining
works: installation of AR/AV, installation of pressure test, asphalt
restoration. |
|
Surface
flowmeter is already installed. The developer is awaiting for the excavation
permit for the interconnection tapping point. |
|
|
|
3.0 |
Prop. Ø100mm
Flow Meter for Marco Polo Residences (Veterans Drive, Nivel Hills, Apas, Cebu
City) |
dia.
100mm large meter assembly & interconnection |
Marco
Polo Residences |
Federal
Land, Inc. |
Project
Management Office |
PhP |
535,054.44 |
14
WD |
Mar 10, 2014 |
Mar 28, 2014 |
|
Developer
is on the process of procurement of materials. |
|
Developer is on
the process of procurement of materials. |
|
|
|
4.0 |
Prop. Ø150mm
Surface Flow Meter for Monterrazas Subd. (Brgy. Guadalupe, Cebu City) |
dia.
150mm large meter assembly & interconnection |
Monterrazas
Subdivision |
GENVI
Development Corp. |
Project
Management Office |
PhP |
481,029.27 |
9
WD |
|
|
98.00% |
The
hydrotesting of the installed pipeline and flowmeter assembly has been
completed. The Developer plans to schedule the disinfection and
interconnection activities by January 2015. |
|
The
hydrotesting of the installed pipeline and flowmeter assembly has been
completed. The Developer plans to schedule the disinfection and
interconnection activities by January 2015. |
|
|
|
5.0 |
Prop. Ø100mm
Surface Mounted Bulkmeter for One Pavilion Place, (Banawa, Guadalupe, Cebu
City) |
dia.
100mm large meter assembly & interconnection |
One
Pavilion Place |
Goldpeach
Properties Corp. |
Project
Management Office |
PhP |
892,244.28 |
39
CD |
May 5, 2014 |
|
|
Materials
are availlable already. However, DPWH had denied their request for excavation
permit. Developer is processing on their request to MCWD that their existing
Ø 25mm pipeline be upgraded to Ø 50mm. |
|
Materials are
availlable already. However, DPWH had denied their request for excavation
permit. Developer is processing on their request to MCWD that their existing
Ø 25mm pipeline be upgraded to Ø 50mm. |
|
|
|
6.0 |
Prop. Ø75mm
Surface Flow Meter for Mabolo Garden Flats (Tres Borces St., Mabolo, Cebu
City) |
dia.75mm
large meter, large meter assembly & interconnection |
Mabolo
Garden Flats |
Primary
Homes, Incorporated |
Project
Management Office |
PhP |
334,970.76 |
N.A. |
Aug 18, 2014 |
N.A. |
|
Developer
is on the process of procurement of materials and permits. |
|
Developer is on
the process of procurement of materials and permits. |
|
|
7.0 |
Prop. Ø75mm
Surface Flow Meter for Eagle's Nest (Canduman, Mandaue City, Cebu) |
dia.75mm
large meter, large meter assembly & interconnection |
Eagle's
Nest |
Primary
Homes, Incorporated |
Project
Management Office |
PhP |
363,680.52 |
15
Working Days |
Aug 18, 2014 |
Sep 1, 2014 |
|
Developer
is on the process of procurement of materials. |
|
Developer is on
the process of procurement of materials. |
|
|
8.0 |
Prop. Ø100mm
Surface Flow Meter for Grand Residences (Tower 1 and 2) (Archbishop Reyes
Ave., Cebu City) |
dia.
100mm large meter, large meter assembly,
78 l.m. of Ø 100mm water distribution line & interconnection |
Grand
Residences (Tower 1 and 2) |
Grand
Land, Inc. |
Project
Management Office |
PhP |
474,041.64 |
14
Working Days |
Sep 1, 2014 |
Sep 16, 2014 |
|
Developer
is on the process of procurement of materials. |
|
Developer is on
the process of procurement of materials. |
|
|
9.0 |
Prop. Ø150mm
Surface Flow Meter for Astana Subdivision (Calawisan, Lapulapu City) |
dia.
150mm large meter, large meter assembly,
10 l.m. of Ø 150mm water distribution line & interconnection |
Astana
Subdivision |
Johndorf
Ventures Corporation |
Project
Management Office |
PhP |
564,233.88 |
20 Working Days |
Sep 3, 2014 |
Sep 26, 2014 |
|
Developer
is on the process of procurement of materials. |
|
Developer is on
the process of procurement of materials. |
|
|
10.0 |
Prop.
Ø150mm Bulk Meter Connection for
Sunrise Place Subdivision (Sitio Malinao Brgy. Agus, Lapulapu City) |
dia.
150mm large meter and assembly, 10 l.m. of Ø 150mm PVC water distribution
line |
Sunrise
Place Subdivision |
Filinvest
Land, Inc. |
Project
Management Office |
PhP |
573,409.74 |
25
Working Days |
Mar 18, 2015 |
Apr 15, 2015 |
|
A
Pre-Construction meeting was conducted on March 18, 2015 |
|
A
Pre-Construction meeting was conducted on March 18, 2015 |
|
|
11.0 |
Prop.
Ø100mm Surface FlowMeter for Almiya
Subdivision (Brgy. Canduman, Mandaue City, Cebu) |
dia.
100mm large meter and assembly, 7 l.m. of Ø 100mm PVC water distribution line |
Almiya
Subdivision |
Aboitizland,
Inc. |
Project
Management Office |
PhP |
378,540.42 |
9
Working Days |
Mar 26, 2015 |
Apr 5, 2015 |
|
A
Pre-Construction meeting was conducted on March 26, 2015 |
|
A
Pre-Construction meeting was conducted on March 26, 2015 |
|
|
12.0 |
Prop.
Ø100mm Surface FlowMeter for Mivesa
Garden Residences (Salinas Drive Extension, Brgy. Lahug, Cebu City) |
dia.
100mm large meter and assembly, 6 l.m. of Ø 100mm PVC water distribution line |
Mivesa
Garden Residences |
Cebu
Landmasters, Inc. |
Project
Management Office |
PhP |
793,185.53 |
15
Working Days |
Apr 6, 2015 |
Apr 24, 2015 |
|
A
Pre-Construction meeting was conducted on April 6, 2015 |
|
A
Pre-Construction meeting was conducted on March 26, 2015 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section IV. Ongoing Subdivision/Hotel/Condo Water System Projects 11 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|