Name of Proposed Project |
Over-all Responsible Unit |
Status of
Work |
Remarks |
|
|
|
|
|
|
|
|
|
|
|
|
Survey |
Right of Way |
Design |
Estimate |
Bid Documents |
MOA |
|
|
|
1. Projects
for Implementation Thru Joint Venture |
|
|
|
|
|
|
|
|
|
|
|
1.1 Bulk
Water Supply (w/ sources confirmed) |
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Pit-os Injection Point |
JV Committee |
n/a |
n/a |
n/a |
n/a |
n/a |
|
Awarded
to Abejo Water Corporation. Signing of JV Conctract done on June 19, 2013.
Will be endorsed to PMO for monitoring/supervision. |
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
1.0 Prop. Ø300 mm DI
Distribution Line along Pit-os,
Bacayan, Talamban, Cebu City |
|
|
|
|
|
|
|
See Item No. 3
of Section 1 - Ongoing Infrastructure Projects |
|
|
|
2.0 |
Gabi Injection
Point |
JV Committee |
n/a |
n/a |
n/a |
n/a |
n/a |
|
Awaiting
for resolution by the court for the motion for reconsideration filed by
Mactan Rock pertaining to the preliminary injunction. |
|
|
|
3.0 |
Cabancalan
Injection Point |
JV Committee |
n/a |
n/a |
n/a |
n/a |
n/a |
|
Published for competitive price
challenge on June 17, 2013. Target end of publication will be on July 18,
2013. |
|
|
|
1.2. Water
System Improvement |
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Mactan Water
System Improvement Program - Package 4 |
Engineering
Department |
completed |
completed |
completed |
completed |
n/a |
n/a |
All
proposed pipeline expansion projects under Package 2 will be redesign as part of the Hydraulic Area 1 for Carmen Bulk Water Supply. Proposed
implementation schedule and preliminary estimates are to be presented to
EXECOM for deliberation and approval. |
|
|
|
|
|
2. Pipeline
Expansion |
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Mactan Water
System Improvement Program - Package 2 |
Engineering
Department |
completed |
completed |
completed |
completed |
|
n/a |
All
proposed pipeline expansion projects under Package 2 will be redesign as part of the Hydraulic Area 1 for Carmen Bulk Water Supply. Proposed
implementation schedule and preliminary estimates are to be presented to
EXECOM for deliberation and approval. |
|
|
|
|
|
|
2.0 |
Mactan Water
System Improvement Program - Package 3 |
Engineering
Department |
completed |
completed |
completed |
completed |
|
n/a |
Failure
of bidding on Package 2A and C. Only Package 3B is to be awarded. The rest of
expansion pipelines will be redesigned and to be included in the Hydraulic
Area 1 of Carmen Bulk Water Supply. Proposed implementation schedule and
preliminary estimate are to be presented to EXECOM for deliberation and
approval. |
|
|
|
|
|
|
3.0 |
Mactan Bubbles-
MAC 6 & 7 (Cluster F)-Connecting Pipelines |
Engineering
Department |
completed |
on
going; LD had issued ROW assurance |
completed |
completed |
n/a |
n/a |
ROW
for Mac 6 proposed connecting line was already issued LD while Mac 7 is
recommneded for expropriation. |
|
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Mactan Bubbles - MAC 6, 7
& 8 (Cluster D) - Pumping Station |
|
|
|
|
|
|
|
See Sub-Item
No. 3 Item No. 3 of Section III - Ongoing By-Administration Projects |
|
|
|
|
4.0 |
Mactan Bubbles - MAC 8
Connecting Pipeline |
Engineering Department |
ongoing |
on
going; LD had issued ROW assurance |
|
|
|
|
ROW is under
negotiation. Awaiting for feedback from the lot owners on the request for
deed of donation. |
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Mactan Bubbles - MAC 6, 7
& 8 (Cluster D) - Pumping Station |
|
|
|
|
|
|
|
See Sub-Item
No. 3 Item No. 3 of Section III - Ongoing By-Administration Projects |
|
|
|
|
5.0 |
MAC 10 & MAC 11 Pipeline Network (Mutual Homes) |
Engineering Department |
completed |
completed |
completed |
completed |
|
n/a |
Submitted to
Technical Services Group for implementation |
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Mactan Bubbles - MAC 10,
& 11 (Cluster D) - Pumping Station |
|
|
|
|
|
|
|
See Sub-Item
No. 4 Item No. 3 of Section III - Ongoing By-Administration Projects |
|
|
|
6.0 |
Proposed 200mm
dia. D.I. Water Distribution Mains Along E. Bascon St., Dumlog, Talisay City |
Engineering
Department |
completed |
n/a |
completed |
completed |
n/a |
n/a |
Budget for the
said project is considered approved in principle but awaiting for ROW
Clearance to be issued LD . ED to prepare request for ROW clearance to LD. |
|
|
|
|
7.0 |
Proposed 150mm
dia. D.I. Lateral Expansion for Sitio Pundok, Brgy. Pit-os, Cebu City |
Engineering
Department |
completed |
on going |
completed |
completed |
n/a |
n/a |
As
per Atty Panares information, ROW is already cleared. LD will then
transmit ROW Clearance to ED. |
|
|
|
8.0 |
Proposed D.I.
Lateral Pipelines for Hidden View and Villa Leyson Brgy. Bacayan, Cebu City |
Engineering
Department |
completed |
on going |
completed |
completed |
n/a |
n/a |
The
draft MOA for Hidden View Subdivision is still subject for review by the
Homeowners Association. Still awaiting
for ROW clearance issued by Legal Dept. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section V. Projects Proposed for Implementation |
13 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name
of Proposed Project |
Over-all Responsible Unit |
Status of
Work |
Remarks |
|
|
|
|
|
|
Survey |
Right of Way |
Design |
Estimate |
Bid Documents |
MOA |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
9.0 |
Proposed
Expansion/Lateral Project for Pit-os and Bacayan (Pit-os Extension Pipelines
Project and Sitio Kauswagan) |
Engineering
Department |
completed |
completed |
completed |
completed |
n/a |
n/a |
Already
submitted to TSG for implementation as Contracted Project. PR was submitted
on June 26, 2013 with PR No. 23641-001 |
|
|
|
10.0 |
Proposed 100mm
dia. D.I. Extension Project for Urbanville Homes, Brgy. Pit-os, Cebu City |
Engineering
Department |
completed |
on going |
|
|
n/a |
n/a |
Removed
from original design and estimate on
ø300mm Extension Pipelines for Brgy. Pit-os. THe prop. Ø100mm pipeline is to
be transferred to the opposite side of the road. Negotiation of ROW clearance
is still on process. |
|
|
|
11.0 |
Proposed 100mm
dia. D.I. Expansion Project at Sitio Curva, San Vicente, Liloan, Cebu |
Engineering
Department |
completed |
completed |
completed |
completed |
n/a |
n/a |
Already
submitted to TSG for implementation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. Pipeline Rehabilitation |
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Prop. Expansion/Rehabilitation
Pipelines Project for Mactan Water Distribution System (Cluster F) : |
Engineering Department |
|
|
|
|
|
|
|
|
|
|
|
a. Road to Tambuli |
completed |
completed |
completed |
completed |
|
n/a |
ROW
acquisition is still on process. |
|
|
|
|
b. Road to Mactan Rock |
completed |
completed |
completed |
completed |
|
n/a |
Brgy.
Marigondon Officials had just informed MCWD that prop. pipe route is no
longer part of their jurisdiction, but with Suba Basbas already. ROW
clearance request is to be transferred to Brgy. Subabasbas. |
|
|
|
|
c. Pajac |
completed |
completed |
completed |
completed |
|
n/a |
ROW
already clearred |
|
|
|
|
d. Sitio Angasil |
completed |
completed |
completed |
completed |
|
n/a |
ROW
already clearred |
|
|
|
2.0 |
Cebu North Road, Poblacion,
Compostela |
Engineering
Department |
completed |
|
on-going |
on-going |
|
n/a |
The
previously designed Ø150mm pipelines will be superseded with a new proposed
design ø200mm X 5+ km length
distribution line.For preparation of the detailed design and estimates by ED. |
|
|
|
3.0 |
MEPZ-1 Gate2 & Gate3 |
Engineering
Department |
completed |
|
completed |
completed |
|
n/a |
Pipe
size verification by Hydraulic Analysis Group already completed. Already
submitted to AGM TSG for implementation. |
|
|
|
7.0 |
Poblacion, Consolacion (H. Pepito) |
Engineering
Department |
completed |
|
completed |
completed |
|
n/a |
ROW clearance
is still on process. |
|
|
|
8.0 |
San Vicente Liloan |
Engineering
Department |
completed |
|
|
|
|
n/a |
scheduled for
detailed design and estimates |
|
|
|
9.0 |
Tayud, Consolacion -Area 1 |
Engineering
Department |
completed |
|
|
|
|
n/a |
scheduled for
detailed design and estimates |
|
|
|
10.0 |
Tayud, Consolacion -Area 2 |
Engineering
Department |
on-going |
|
|
|
|
n/a |
scheduled for
detailed design and estimates |
|
|
|
11.0 |
Calero, Liloan |
Engineering
Department |
completed |
|
|
|
|
n/a |
scheduled for
detailed design and estimates |
|
|
|
12.0 |
Ma. Gochan, Mambaling |
Engineering
Department |
completed |
|
|
|
|
n/a |
scheduled for
detailed design and estimates |
|
|
|
4. Pumping
Station |
|
|
|
|
|
|
|
n/a |
|
|
|
|
1.0 |
Well T-1 |
Engineering
Department |
|
on-going |
|
|
|
|
ROW
assurance already issued by LD. Payment has already been made. Awaiting for
the Deed of Absolute Sale. |
|
|
|
2.0 |
Well L-4 |
Engineering Department |
completed |
n/a |
n/a |
n/a |
|
n/a |
Proposed
project is advised to be terminated. No improvement will be done on the
existing pumping station as per advised by PDD and MSSD. |
|
|
|
|
3.0 |
Well L-8 |
Engineering
Department |
completed |
n/a |
on-going |
on-going |
|
n/a |
PDD and ED had
already agreed on design considerations. ED will now proceed for the detailed
design. Expected to be completed on
October 2013. |
|
|
|
|
4.0 |
In-house Water
Sourcing Cluster- B (MC-23 and G-10) |
|
|
|
|
|
|
|
|
|
|
|
|
a. MC 23 |
Engineering Department |
on going |
completed |
|
|
|
|
Proposed new
pipe route is scheduled for route survey . Detailed design and estimate will
then follow. |
|
|
|
|
b. G-10 |
Engineering
Department |
completed |
completed |
completed |
completed |
|
|
MC 23 &
G-10 is one cluster for the implementation. Thus, G-10 implementation is
dependent on the completion of MC 23 detailed design and estimates. |
|
|
|
5.0 |
CUB-1 |
Engineering
Department |
completed |
completed |
completed |
completed |
|
n/a |
Revised design
and estimate is Php 9.7M from the original Php7.0M. Engineering Dept. Is asking for budget
augmentation to FMD. |
|
|
|
6.0 |
Man- 1 |
Engineering
Department |
completed |
completed |
completed |
completed |
|
|
Forwarded
to TSG for implementation. PR was
submitted on June 26, 2013 with PR No. 23642-001 |
|
|
|
|
|
|
|
|
Section V. Projects Proposed for Implementation |
14 |
|
|
|
|
|
Name
of Proposed Project |
Over-all Responsible Unit |
Status of
Work |
Remarks |
|
|
|
|
|
|
Survey |
Right of Way |
Design |
Estimate |
Bid Documents |
MOA |
|
|
|
5.
Reservoir |
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
500 cu.m. Nivel Hills Concrete Reservoir / Busay |
Engineering Department |
completed |
|
see
remarks |
see
remarks |
|
n/a |
Deferred, as per Engr. Singson advisory due to
the possible increase of storage capacity coming from the JV Bulk Water
Supplier. For review of final capacity based on the ideal required volume for the area. |
|
|
|
2.0 |
500m3
Concrete Reservoir at Oprra |
Engineering
Department |
completed |
|
see
remarks |
see
remarks |
|
n/a |
|
|
|
|
6.
Other Projects |
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Proposed MSSD
Building |
Engineering
Department |
completed |
completed |
on-going |
|
|
|
Detailed
Design, Plan and Specifications are already completed. For final review by ED Manager. |
|
|
|
|
|
2.0 |
Septage |
MCWD |
|
see remarks |
see remarks |
see remarks |
|
|
For Cordova:
The Honorable Municipal Council of Cordova had already passed its Septage
Ordinance. Cordova is the town where the proposed Septage Treatment Plant
will be constructed. This treatment plant will cater Cordova, Lapulapu City
and part of Mandaue City. For now
implementation for said Treatment Plant has been deferred pending passing of
Lapulapu City Septage Ordinance. A
copy of TOR from Baliuag Water District is now at Corplan for reference of
implemenation scheme. |
|
|
|
|
|
|
|
|
|
|
|
|
For Lapulapu : The regular
meeting between MCWD and Lapulapu City Government for the
preparation/drafting of the Proposed Amendments of the Existing Septage
Ordinance such as mandatory desludging and the sludge must be treated in a
Septage Treatment Plant is being
deferred awaiting the proclamation of
the new set of City Officials after May 2013 Election. |
|
|
|
|
|
|
|
|
|
|
|
|
For Cebu City: A regular
meeting of the Technical Working Group that composed personnel from Cebu City
Government, MCWD, DENR and other concerned government agencies for the preparation of Draft Septage
Ordinance was temporary stopped pending the result and proclamation of the
new set of Cebu City Officials after May 2013 Election. |
|
|
|
7. WASEC Projects |
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Mactan Plains
Subdivision (MOTHER METER) |
Engineering
Department |
completed |
n/a |
completed |
completed |
n/a |
|
awaiting
for the realization of interconnecting pipelines project and lateral
pipelines for of Sitio Angasil (Cluster F) |
|
|
|
2.0 |
Summerville 2
Subdivision |
Engineering
Department |
completed |
n/a |
completed |
completed |
n/a |
|
No
feedback from the developer regarding their rquest. Lot ownership issue is
yet to be settled by the developer. |
|
|
|
3.0 |
Pasadena
Subdivision Phase 2 |
Engineering
Department |
completed |
n/a |
completed |
completed |
n/a |
|
The
draft MOA was forwarded to the Developer. Put on hold until further notice by
the Developer. No feedback from the developer. Phase 1 is currently connected
with our system. |
|
|
|
4.0 |
Summerville 3
Subdivision |
Engineering
Department |
completed |
n/a |
completed |
completed |
n/a |
completed |
Project
completed |
|
|
|
5.0 |
Proposed Ø75mm
Surface Mounted Flowmeter for Bamboo Bay Community at Subangdaku, Mandaue
City |
Engineering
Department |
completed |
n/a |
completed |
completed |
n/a |
|
Awaiting
for developer's feedback. |
|
|
|
6.0 |
Proposed Ø75mm
Surface Mounted Flowmeter for Midori Residences at A.S. Fortuna Ave., Mandaue
City |
Engineering
Department |
completed |
n/a |
completed |
completed |
n/a |
|
Awaiting
for developer's feedback. |
|
|
|
7.0 |
Proposed Ø100mm
Surface Mounted Flowmeter for One Pavilion Place at Banawa, Guadalupe, Cebu
City |
Engineering
Department |
completed |
n/a |
completed |
completed |
n/a |
|
Currently
connected with our system using 2" meter assembly. NO feedback on the
proposed upsizing of meter assembly. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section V. Projects Proposed for Implementation |
15 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|