Name of Project |
Project Beneficiary |
Implementing Unit |
Approved Budget |
Duration |
Date Started |
Completion Date |
Schedule
and Accomplishment |
Remarks |
|
|
Target To Date |
Actual To Date |
Variance To Date |
|
|
Original |
Revised |
Original |
Revised |
Original |
Revised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Pipeline Expansion |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Lagtang Distribution Line[1] |
Sitio Tigib-Burlas, Lagtang, Residents |
Construction Department |
PhP |
2,660,000.00 |
PhP |
|
68 c.d. |
|
|
|
|
|
|
|
MCWD made
correction of the DPWH restoration cost which is higher than the former
estimates. The amount of cash bond was already adjusted and the former posted
a bond based on the adjusted amount. Awaiting for the release of the
excavation permit. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 |
Casili Estate Distribution Line |
Casili Estate Residents |
Construction Department |
PhP |
1,391,000.00 |
PhP |
|
21 c.d. |
|
|
|
|
|
|
|
There was a
failure of bidding. The re-bidding is on process. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.0 |
St. Anthony Village, Hi-way 77,
75mm dia. x 234 LM |
St. Anthony Village |
Construction Department |
PhP |
1,100,000.00 |
PhP |
|
23 c.d. |
|
|
|
|
|
|
|
The pipe
supplied by the winning bidder were rejected. Until to date, the supplier has
not replaced the rejected pipes. MCWD is still coordinating with the
supplier. Meanwhile, a new PR has been prepared to purchase the materials for
the project. |
|
|
4.0 |
Proposed 75mm dia. uPVC Water
Distribution Mains at Campo2, Brgy. Jaclupan, Talisay City |
Campo 2, Brgy. Jaclupan
Residents |
Construction Department |
PhP |
4,820,000.00 |
PhP |
|
120 c.d. |
|
|
|
|
|
|
|
Materials
needed for the project are due for BMS encoding |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. Pipeline
Rehabilitation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Proposed Ø100mm
X 192 lm DI Distribution Rehabilitation
Project along I Tabura St., |
Brgy. Pardo,
Cebu City |
Construction
Department |
PhP |
1,766,946.23 |
PhP |
|
43 c.d. |
|
|
|
|
|
|
|
The
procurement status of this project is still being clustered. |
|
|
2.0 |
Proposed Ø200mm
X 301 lm DI Distribution Rehabilitation Project along Datag, Maribago, Lapulapu City |
Datag, Maribago,
Lapulapu City |
Construction
Department |
PhP |
4,608,000.00 |
PhP |
|
45 c.d. |
|
|
|
|
|
|
|
The
procurement status of this project is still being clustered. |
|
|
3.0 |
F. Llamas,
Labangon Realignment of 200mm and 100mm uPVC |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The
revised plan had already been completed. The revised plan involves DI pipes
however, the Construction Department requested that PVC pipes is to be used
instead of DI pipes since the project is considered urgent for
implementation. The Engineering Department agreed to such request. |
|
|
4.0 |
Proposed Ø200mm
X 440 lm DI Distribution Rehabilitation
Project at Brgy. Jubay, Liloan, Cebu |
Brgy. Jubay Residents |
Construction Department |
PhP |
4,188,596.15 |
PhP |
|
58 c.d. |
|
|
|
|
|
|
|
PR for the
requried materials was processed on April 8, 2013 with PR no. 23548-001 to
056 |
|
|
5.0 |
Proposed Decommissioning of
Exisitng Ø100mm x153lm uPVC Pipeline and Transfer Tapping of Service
Connections at Sitio Looc, Liloan, Cebu |
Sitio Looc, Liloan Residents |
Construction Department |
PhP |
238,452.25 |
PhP |
|
9 c.d. |
|
|
|
|
|
|
|
PR for the
requried materials was processed on April 8, 2013 with PR no. 23515-001 to
026 |
|
|
3. Pumping Station |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Sta. Cruz Well (Liloan) |
Brgy. Sta Cruz Residents |
Bayanihan - C/O PDD |
PhP |
5,590,000.00 |
PhP |
|
87 c.d. |
|
|
|
|
|
97% |
|
The materials are
already available. Awaiting for the personnel who will work for the perimeter
fence. Said personnel are currently assigned at the Jaclupan rehabilitation
project. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 |
Well 35 |
Berjame
Subdivision and Barangay Talamban Residents |
Bayanihan - C/O PDD |
PhP |
|
|
|
|
|
4 Feb 2012 |
30Apr2012 |
|
|
98% |
|
The
project is expected to commence on July 2013. |
|
|
3.0 |
Mac 6, 7 & 8 Pumping
Stations Cluster C |
Brgy. Pajac & Bankal Residents in Lapulapu City |
Construction
Department/ MSSD |
PhP |
8,709,862.10 |
PhP |
|
113 c.d. |
|
|
|
|
|
|
|
For clustering
of materials as of April 29,2013. |
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Mac 6 & 7 Connecting
Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Sub-Item
No. 3 Item No. 2 of Section V Projects Proposed for Implementation |
|
|
|
2.0 Mac 8 Connecting Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Sub-Item
No. 4 Item No. 2 of Section V Projects Proposed for Implementation |
|
|
4.0 |
Mac 10 & 11
Pumping Stations |
Brgy. Pajac,
Bankal & Agus Residents in Lapulapu City |
Construction
Department/ MSSD |
PhP |
6,508,756.40 |
PhP |
|
36 c.d. |
|
|
|
|
|
|
|
PR
for the requried materials was processed on June 20, 2013 with PR no.
23662-001 |
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Mac 10 & 11 Connecting
Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Sub-Item
No. 5 Item No. 2 of Section V Projects Proposed for Implementation |
|
|
5.0 |
MAC 12 Pumping Station |
Portville Subd., Brgy. Buaya, Lapulapu City |
Construction
Department/ MSSD |
PhP |
3,000,000.00 |
PhP |
|
45 c.d. |
|
|
|
|
|
|
|
PR
for the materials needed for the project was submiited on May 7, 2013 with PR
no. 23585-001 |
|
|
5. Infrastructure |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
ProposedRoofing of MCWD
Talamban Laboratory Terrace |
MCWD Compound, Nasipit, Brgy.
Talamban, Cebu City |
Construction
Department |
PhP |
88,058.00 |
PhP |
|
12 c.d. |
|
|
|
|
|
|
|
Procurement
is on-going. Some of the materials has not been delivered yet. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section
III. Ongoing
By-Administration Projects |
8 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|