Name of Contract Joint Venture Partner Minimum Volume                         Supply                       Cost Date of Contract Signing / Notice to Proceed Day 1                                      Delivery Date Remarks
Original Revised
                         
1.0 Bulk Water Supply Program - BC Homes Injection Point Abejo Waters Corporation    2,000 m3/day PhP 16.48 /m3 29 Apr 2010 29 Oct 2010 31 Aug 2012 The Apas Injection Point (originally at BC Homes) has been supplying water to MCWD since December 21, 2011.
            On the required Data Monitoring Software (calculate/tabulate data, show graphs, indicate under- or over-supply), AWC has the option to use either the PWRI-developed Data Monitoring Software or the Premier Portal Web. PMO is awaiting advice from AWC of its choice.
            The Flowmeter Data Loggers have been experiencing  data transmission problem. The loggers are using Globe Sim Card to transmit data to MCWD; the flowmeter supplier is checking the possibility of a Globe system upgrading that may have caused the data transmission problem. 
                        The Phase I of this Joint Venture (i.e. installation of production and supply facilities) will be declared fully completed only after the succesful installation and operation of the software. 
             
2.0 Bulk Water Supply Program - Banawa Injection Point Pilipinas Water Resources, Inc.    1,500 m3/day PhP 14.68 /m3 18 May 2010 18 Nov 2010 02 Jan 2011 The Banawa Injection Point has been supplying water to MCWD since December 9, 2011.
            Lately, the latest version of the Data Monitoring Software developed by PWRI had been completed and  installed at PDD's Service Computer. The software will undergo a 1 month trial run.  During the supposed start of the trial run using Globe Sim Card, data were not transmitted to PDD Service Computer. PWRI had sensed a problem on the Globe System and is presently working on using Smart Sim Cards instead.
                        The Phase I of this Joint Venture (i.e. installation of production and supply facilities) will be declared fully completed only after the succesful installation and operation of the data monitoring software. 
             
3.0 Bulk Water Supply Program - Talamban Injection Point Pilipinas Water Resources, Inc.    3,592 m3/day PhP 14.21 /m3 19 Nov 2010 19 May 2011 5 Dec 2011 The Talamban Injection Point has been supplying water to MCWD since December 6, 2011.  
            Lately, the latest version of the Data Monitoring Software developed by PWRI had been completed and  installed at PDD's Service Computer. The software will undergo a 1 month trial run.  During the supposed start of the trial run using Globe Sim Card, data were not transmitted to PDD Service Computer. PWRI had sensed a problem on the Globe System and is presently working on using Smart Sim Cards instead.
            The Phase I of this Joint Venture (i.e. installation of production and supply facilities) will be declared fully completed only after the succesful installation and operation of the data monitoring software. 
                         
             
4.0 Bulk Water Supply Program - Marigondon-Gabi Injection Point Mactan Rock Industries, Inc.    5,000 m3/day PhP 26.72 /m3 signing:                                06 Dec 2010                            effectivity:                   01 Jan 2011 01 Jul 2011 8 Jan 2012 The Marigondon-Gabi Injection Point has been supplying water to MCWD since February 17, 2012.
              MRII had informed it will use the PWRI-developed Data Monitoring Software. MRII is awaiting the successful trial run of the software.
              On the installed pH and Chlorine Data Logger, after series of calibration, the Water Quality Control Division has formally approved and accepted  the tolerance on the readings of  the manual vis a vis logger readings. 
                        The Phase I of this Joint Venture (i.e. installation of production and supply facilities) will be declared fully completed only after the succesful installation and operation of the data monitoring software. 
                   Section II.      On-going Joint Venture Undertakings                                                                                                                  5
Name of Contract Joint Venture Partner Minimum Volume                         Supply                       Cost Date of Contract Signing / Notice to Proceed Day 1                                      Delivery Date Remarks
Original Revised
                         
5.0 Bulk Water Supply Program - Guadalupe Injection Point Abejo Waters Corporation    3,000 m3/day PhP 14.98 /m3 07 Dec 2011 06 Dec 2012 Time Extension on process This JV Contract has 3 injection points spread over Brgy. Guadalupe: Guadalajara, Kabajar, and Quijada.
              Guadalajara Injection Point :  
                Since September 2012, the Guadalape injection point  has been supplying an average of 2,400m3 of water daily to MCWD.  
                Kabajar Injection Point :  
                Since the resumption of its operation on April 3, 2013, the Kabajar injection point has been supplying an average of  600m3 of water daily to MCWD.   
              Quijada Injection Point :  
              AGM Singson had made a follow-up to the office of AGM Delco on the final decision regarding the request of AWC to relocate the Quijada injection point.  
              PDD has a proposal that  instead of relocating the Quijada Injection point, the two (2) wells intended for Quijada Injection Point shall have individual injection point. On a meeting called by AGM Delco this month, AWC said it will agree on the proposal provided that the original supply volume at the Quijada area be increased. AGM Delco will confer the matter to Legal Department and concerned MCWD units.
  Related Project (for Quijada Injection Point only):              
  1.0 Proposed Monterrazas Pipelaying Project               See Item No. 6 of Section I - Ongoing Infrastructure Projects
  2.0 Proposed 1000 m3 Modular Tank             See Item No. 10 of Section I - Ongoing Infrastructure Projects
                         
                   Section II.      Ongoing Joint Venture Undertakings                                                                                                                  6