REPORT SUMMARY |
|
|
|
|
C.
SECTION IV ON-GOING 'BY ADMINISTRATION' PROJECTS |
|
|
|
|
|
|
Name
of Project |
Project Beneficiary |
Implementing Unit |
Approved Budget |
Duration |
Date Started |
Completion Date |
Schedule
and Accomplishment |
Remarks |
|
LATEST UPDATE AS OF FEBRUARY 2013 |
|
|
Target To Date |
Actual To Date |
Variance To Date |
|
|
|
Original |
Revised |
Original |
Revised |
Original |
Revised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C.1 Pipeline Expansion |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Lagtang Distribution Line[1] |
Sitio Tigib-Burlas, Lagtang, Residents |
Construction Department |
PhP |
2,660,000.00 |
PhP |
|
68 c.d. |
|
|
|
|
|
|
|
The MCWD &
DPWH had already conducted the Scheduled Site Inspection of the area January
28, 2013. The latter instructed us to reflect the sketch cross-section of
trench excavation & existing road on the plan, for them to evaluate the
exact area & volume of the damage road pavement. However, the DPWH
assured us that they will initiate the processing of the excavation permit,
even before the said sketch is submitted to. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 |
Casili Estate Distribution Line |
Casili Estate Residents |
Construction Department |
PhP |
1,391,000.00 |
PhP |
|
21 c.d. |
|
|
|
|
|
|
|
There is no
movement in the processing of the Electromagnetic Metering Chlorine Injector.
It is still in the BAC TWG as of thie writing. |
|
|
follow up IDA on
booster procurement |
|
|
3.0 |
Pusok,
Lapu-Lapu (Matumbo), Pipe laying 96 LM x 75mm dia. & 126 LM x 150mm dia.
D.I. |
Pusok, Lapu-lapu |
Construction
Department |
PhP |
2,292,548.83 |
PhP |
|
145 c.d. |
|
11 Feb 2013 |
21 May 2013 |
|
|
|
|
The
project is scheduled to commence on February 11, 2013 with the completion
date on May 21, 2013. |
|
Project has started as
scheduled. |
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Prop. Water Distribution
System for East Gate Subdivision
(Matumbo, Pusok, Lapulapu) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Part D
Section V Subsection D.1 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.0 |
St. Anthony Village, Hi-way 77,
75mm dia. x 234 LM |
St. Anthony Village |
Construction Department |
PhP |
1,100,000.00 |
PhP |
|
23 c.d. |
|
|
|
|
|
|
|
The project is
still awaiting the delivery of pipes & other materials. The pipes
intended for this project delivered by the supplier in January 2013 had been
rejected because they have been found to be not in standard size as ordered.
The excavation permit has already been applied by Legal Department. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5.0 |
Berjame Subdivision, Tigbao
Talamban, 100mm dia. x 211LM, 75mm dia. x 391 LM, 50mm dia. x 141 LM |
Berjame Subdivision |
Construction Department |
PhP |
2,027,423.69 |
PhP |
|
42 c.d. |
|
11 Feb 2013 |
21 May 2013 |
|
|
|
|
The project is
scheduled to commence on February 11, 2013 with the completion date on March
16, 2013. |
|
Project has already started. Expected to be completed by March
16, 2013. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Related Projects: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Well 35 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Part C
Section IV Subsection C.3 of the Report Summary |
|
|
|
2.0 Ø100mm Interconnecting
Pipeline (W35) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Part C
Section VII Subsection F.2.1 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.0 |
Alberlyn South Road, Cansojong
Talisay |
Alberlyn South Road Subdivision |
Construction
Department/ Pipeline Maintenance Group Central (PMG) |
PhP |
1,596,881.63 |
PhP |
|
52 c.d. |
|
|
|
|
|
|
|
The installed
pipeline has already passed the hydrotesting & chlorinator test. The
remaining works to be done is restoration works of the damaged pavement. |
|
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Prop. Water Distribution
System for Alberlyn South Subdivision (Cansojong, Talisay City, Cebu) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Part D
Section V Subsection D.1 of the Report Summary |
|
|
7.0 |
Proposed Water
Distribution System for Biasong Relocation Site |
P. West Road,
Brgy. Biasong, Talisay City |
Construction
Department |
PhP |
1,300,000.00 |
|
|
36 c.d. |
|
|
|
|
|
|
|
The
procurement status of the Ø100mm & Ø150mm PVC pipes are still being
clustered by BAC. The excavation permit has already been applied by Legal
Department. |
|
Schedule of delivery of pipes
is in the last week of February 2013. The granting of the excavation permit
is expected on the first week of March 2013. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C.2 Pipeline
Rehabilitation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Proposed Ø100mm
X 192 lm DI Distribution Rehabilitation
Project along I Tabura St., |
Brgy. Pardo,
Cebu City |
Construction
Department |
PhP |
1,766,946.23 |
PhP |
|
43 c.d. |
|
|
|
|
|
|
|
The
procurement status of this project is still being clustered. |
|
|
|
|
2.0 |
Proposed Ø200mm
X 301 lm DI Distribution Rehabilitation Project |
Datag, Maribago,
Lapulapu City |
Construction
Department |
PhP |
4,608,000.00 |
PhP |
|
45 c.d. |
|
|
|
|
|
|
|
The
procurement status of this project is still being clustered. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section I. Summary 6 |
|
|
|
|
|
REPORT SUMMARY |
|
|
|
|
|
|
|
C.
SECTION IV ON-GOING 'BY ADMINISTRATION' PROJECTS |
|
|
|
|
|
|
|
|
Name
of Project |
Project Beneficiary |
Implementing Unit |
Approved Budget |
Duration |
Date Started |
Completion Date |
Schedule and
Accomplishment |
Remarks |
|
|
Target To Date |
Actual To Date |
Variance To Date |
|
|
Original |
Revised |
Original |
Revised |
Original |
Revised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C.3 Pumping Station |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Sta. Cruz Well (Liloan) |
Brgy. Sta Cruz Residents |
Bayanihan - C/O PDD |
PhP |
5,590,000.00 |
PhP |
|
87 c.d. |
|
|
|
|
|
97% |
|
The pumping station has been
operational since July 2012. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The remaining project component
is the construction of perimeter fence and gate. Some materials are delivered
and available. Construction of fence will commence anytime if the materials
needed are completed. |
|
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Sta. Cruz Distribution
Line, Lilo-an, Cebu |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Part C
Section VII Subsection F.2.1 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 |
Well 35 |
Berjame
Subdivision and Barangay Talamban Residents |
Bayanihan - C/O PDD |
PhP |
|
|
|
|
|
4 Feb 2012 |
30Apr2012 |
|
|
98% |
|
During
the well testing , PDD/Laboratory personnel had detected the presence of high
level Iron Manganese on the water. PDD is planning to install a filter media
(Iron Manganese Treatment Device) to
remove the Iron Manganese. The testing of berm is already done. Berm is the
replacement of sand. The budget for the abovementioned undertaking is now at
CAPEX for budget allocation. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Related Projects: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Berjame Subdivision, Tigbao
Talamban, 100mm dia. x 211LM, 75mm dia. x 391 LM, 50mm dia. x 141 LM |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 Ø100mm Interconnecting
Pipeline (W35) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Already
completed. See Part F Section VII Subsection F.2.1 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.0 |
Mac 6, 7 &
8 Pumping Stations Cluster C |
Brgy. Pajac
& Bankal Residents in Lapulapu
City |
Construction
Department/ MSSD |
PhP |
8,709,862.10 |
PhP |
|
113 c.d. |
|
|
|
|
|
|
|
No
PR is being prepared yet. The BMS has not been approved by FMD because the
ROW of these pumping stations have not been acquired yet. |
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Mac 6 & 7 Connecting
Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Part E
Section VI Subsection E.2 of the Report Summary |
|
|
|
2.0 Mac 8 Connecting Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Part E
Section VI Subsection E.2 of the Report Summary |
|
|
4.0 |
Mac 10 & 11
Pumping Stations |
Brgy. Pajac,
Bankal & Agus Residents in Lapulapu City |
Construction
Department/ MSSD |
PhP |
6,508,756.40 |
PhP |
|
36 c.d. |
|
|
|
|
|
|
|
The
PR of these two pumping stations have already been prepared. |
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Mac 10 & 11 Connecting
Pipeline |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
See Part E
Section VI Subsection E.2 of the Report Summary |
|
|
5.0 |
MAC 12 PUMPING STATION |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
For
Special Budget Appropriation (SBA). |
|
|
C.4 Transfer
Tapping and Decommissioning |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Transfer
Tapping and Deccommissioning at U. Alviola, Tres de Abril, V. Rama and JM
Basa Streets, Cebu City |
Residents at U.
Alviola, Tres de Abril, V. Rama and JM Basa Sts. |
Construction Department |
PhP |
2,737,000.00 |
|
|
74 c.d. |
|
|
Oct. 8, 2012 |
Jan. 4, 2013 |
|
98% |
|
Inspite
of the occurrence of intervening work, the project is ahead of the target
completion. The project is expected to be completed first week of January
2013. |
|
|
|
|
|
Related Projects: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Prop. Replacement of Existing
Distribution Mains Along Tres De Abril, U Alviola, JM Basa and V Rama
Streets, Cebu City |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Already
completed. See Part F Section VII Subsection F.1.2 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section I. Summary 7 |
|
|
|
|
|
|
|
|
|
|
|
` |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|