REPORT SUMMARY |
|
|
|
|
|
|
|
|
|
B. SECTION
III. ON-GOING JOINT VENTURE UNDERTAKINGS |
|
|
|
Name
of Contract |
Joint Venture Partner |
Minimum Volume |
Supply Cost |
Date of Contract Signing / Notice to Proceed |
Day 1
Delivery Date |
Remarks |
|
LATEST UPDATE AS OF FEBRUARY 2013 |
|
|
|
|
|
Original |
Revised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Bulk Water Supply Program - BC Homes Injection Point |
Abejo Waters Corporation |
2,000 |
m3/day |
PhP |
16.48 |
/m3 |
29 Apr 2010 |
29 Oct 2010 |
31 Aug 2012 |
The Apas
Injection Point (originally at BC Homes) has been supplying water to MCWD
since December 21, 2011. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The flow
discrepancy between the 2 parallel flowmeters is already within the required
±5% range. This was acieved through incremental opening/closing of the
butterfly valves inside the flowmeter vault. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The required
Data Monitoring Software (calculate/tabulate/ data, show graphs, indicate
under- or over-supply) has yet to be installed. The use of Premier portal web
(Premier is the supplier of the flowmeters) is being considered in lieu of
the Data Monitoring Software. The MCWD stakeholder units (PDD, MSSD and PMO)
are still assessing the features and capabilities of the Premier portal web. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Ø150mm x
1.60 kms AWC pipeline and component booster station had been completed. VECO,
though, has yet to activate the power supply of the booster pump. PMO had
endoresed the said pipeline to PDD for commissioning. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 |
Bulk Water Supply Program - Banawa Injection Point |
Pilipinas Water Resources, Inc. |
1,500 |
m3/day |
PhP |
14.68 |
/m3 |
18 May 2010 |
18 Nov 2010 |
02 Jan 2011 |
The Banawa
Injection Point has been supplying water to MCWD since December 9, 2011. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The MCWD stakeholder units
(PDD, MSSD and PMO) are still evaluating the test run result of the Data
Monitoring Software (calculate data, show graphs, indicate under- or over-
supply, etc.) developed by PWRI. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Phase I of this Joint
Venture (i.e. installation of production and supply facilities) will be
declared fully completed only after the succesful installation of the
software. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.0 |
Bulk Water Supply Program - Talamban Injection Point |
Pilipinas Water Resources, Inc. |
3,592 |
m3/day |
PhP |
14.21 |
/m3 |
19 Nov 2010 |
19 May 2011 |
5 Dec 2011 |
The Talamban
Injection Point has been supplying water to MCWD since December 6, 2011. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The MCWD stakeholder units
(PDD, MSSD, and PMO) are still evaluating the test run result of the Data
Monitoring Software (calculate data, show graphs, indicate under- or
over-supply, etc.) developed by MWRI. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Phase I of this Joint
Venture (i.e. installation of production / supply facilities and supply of
bulk water) will be declared fully completed after the successful
installation of the data monitoring software. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.0 |
Bulk Water Supply Program - Marigondon-Gabi Injection Point |
Mactan Rock Industries, Inc. |
5,000 |
m3/day |
PhP |
26.72 |
/m3 |
signing: 06 Dec
2010
effectivity:
01 Jan 2011 |
01 Jul 2011 |
8 Jan 2012 |
The
Marigondon-Gabi Injection Point has been supplying water to MCWD since
February 17, 2012. |
|
|
|
|
|
|
|
|
|
|
|
|
|
The required
Data Monitoring Software (calculate/tabulate data, show graphs, indicate
under- or over-supply) has yet to be installed. The use of Premier portal web
(Premier is the supplier of the flowmeters) is being considered in lieu of
the Data monitoring Software. The MCWD stakeholder units (PDD, MSSD, and PMO)
are sill assessing the features and capabilities of the Premier portal
web. |
|
|
|
|
|
|
|
|
|
|
|
|
|
On the
installed pH and Cholorine Instrument, the pH sensor was replaced by the
supplier's representative from Manila on January 11, 2013. Joint
monitoring/observation by MCWD Laboratory and MRII personnel of the pH
reading is ongoing. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section I. Summary 4 |
|
|
|
|
|
REPORT SUMMARY |
|
|
|
|
|
|
|
|
|
B. SECTION
III. ON-GOING JOINT VENTURE UNDERTAKINGS |
|
|
|
Name
of Contract |
Joint Venture Partner |
Minimum Volume |
Supply Cost |
Date of Contract Signing / Notice to Proceed |
Day 1
Delivery Date |
Remarks |
|
|
|
|
Original |
Revised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5.0 |
Bulk Water Supply Program - Guadalupe Injection Point |
Abejo Waters Corporation |
3,000 |
m3/day |
PhP |
14.98 |
/m3 |
07 Dec 2011 |
06 Dec 2012 |
Time Extension on process |
This JV
Contract has 3 injection points spread over Brgy. Guadalupe: Guadalajara,
Kabajar, and Quijada. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Guadalajara
Injection Point : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AWC continues
to deliver about 800 cu.m. water supply daily at this injection point. The
water is sourced from its Well G-1. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additional
partial delivery at the Guadalajara Injection Point had been approved. The
additional supply must conform to the flowrate, volume, and time of delivery
to be set by PDD. AWC is still working on the turbidity and nitrate levels of
the water from it Well G-2 where the additional supply will be sourced. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Kabajar
Injection Point : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Kabajar
Injection Point has been supplying 600-900 cum/day of water to MCWD since
November 8, 2012. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Quijada
Injection Point : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MCWD c/o the
office of AGM Delco is still evaluating the proposal of AWC to relocate the
Quijada injection point. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Ø250mm
MCWD distribution line along Quijada Street, to which the AWC supply line
will connect, has yet to be installed. Installation of said Ø250mm
distribution will be undertaken by Dakay Construction and Development
Corporation under the project Proposed DI Expansion at Monterazzas de Cebu.
The project is expected to be completed by May 2013. Consequently, the
intended Day 1 of delivery for the Guadalupe Joint Venture has to be extended
until June 30, 2013. |
|
|
|
|
|
Related Project (for Quijada Injection Point only): |
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Proposed Monterrazas Pipelaying
Project |
|
|
|
|
|
|
|
|
|
See Part E Section VI Subsection E.2 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section I. Summary 5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|