REPORT SUMMARY
F. SECTION VII.  PROJECTS COMPLETED IN 2012
SUMMARY OF COMPLETED PROJECTS AS OF AUGUST 2012:
F.1.  INFRASTRUCTURE PROJECTS  
Name of Project  Location Project Cost Date Completed Remarks
    1.0 Prop. Ø 300mm HDPE Expansion Project for BC Homes Water Supply (Extension Line) BC Homes, Lahug, Cebu City PhP       6,349,019.67 May 21, 2012 Already complied  with MCWD Standard Requisites. Certification of Project Completion was already issued to the Contractor
    2.0 Prop. Replacement of Existing Distribution Mains Along Tres De Abril, U Alviola, JM Basa and V Rama Streets, Cebu City Tres de Abril, U Alviola, JM Basa and V Rama Streets, Cebu City PhP     12,742,433.09 July 30, 2012 Already complied  with MCWD Standard Requisites. Certification of Project Completion was already issued to the Contractor  
  Related Project:            
    1.0  Transfer Tapping and Deccommissioning at U. Alviola, Tres de Abril, V. Rama and JM Basa Streets, Cebu City           See Part C Section VI Subsection C.2 of the Report Summary
    3.0 Construction of Proposed Pumping Station for MCWD In-House Water Sourcing Program - Cluster A Brgy. Buhisan and Talamban, Cebu City PhP     10,783,223.92 August 24, 2012 Already complied  with MCWD Standard Requisites. Certification of Project Completion was already issued to the Contractor
    4.0 Interim Measure to Protect Existing Ø800mm Transmission Line Across Maghaway River in Brgy. Jaclupan Brgy. Jaclupan, Talisay City PhP       2,492,796.64 August 28, 2012 Already complied  with MCWD Standard Requisites. Certification of Project Completion was already issued to the Contractor
    5.0 Prop. Tennis Court Resurfacing MCWD Compound, Talamban, Cebu City PhP          124,000.00 February 28, 2013 Certification of Project Completion was already issued to the Contractor
    6.0 Prop. Ø75mm Surface Mounted Bulkmeter for TPA-LTHAI Tipolo, Mandaue City PhP          701,581.31    
 
F.2.  'BY ADMINISTRATION' PROJECTS  
F.2.1 PIPELINE EXPANSION
Name of Project  Location Project Cost Date Completed Remarks
    1.0 Upper Canduman Distribution Line  Upper Canduman Residents PhP       1,583,332.00 19-May-12 Already complied  with MCWD Standard Requisites  
    2.0 Ø100mm Interconnection Pipeline from W35  Berjame Subd., Tigbao, Talamban, Cebu City PhP   23-May-12 Already complied  with MCWD Standard Requisites   for as built to coordinate with ED
  Related Project:        
  1.0 Berjame Subdivision, Tigbao Talamban, 100mm dia. x 211LM, 75mm dia. x 391 LM, 50mm dia. x 141 LM           See Part C Section IV Subsection C.1 of the Report Summary
    3.0 Sta. Cruz Distribution Line  Brgy. Sta Cruz, Liloan, Cebu PhP       5,134,317.40 15-June-12 Already complied  with MCWD Standard Requisites  
  Related Project:            
  1.0  Sta. Cruz Well Rehabilitation           See Part C Section IV Subsection C.2 of the Report Summary
    4.0 Prop. Water Distribution System for Alberlyn South Subdivision  Brgy. Cansojong, Talisay City, Cebu PhP       1,596,881.63 7-Feb-2013 Already complied  with MCWD Standard Requisites  
  Related Project:            
    1.0 Prop. Water Distribution System for Alberlyn South Subdivision (Cansojong, Talisay City, Cebu)           See Part D Section V Subsection D.2 of the Report Summary
F.2. 2 WATER SOURCE DEVELOPMENT
Name of Project  Location Project Cost Date Completed Remarks
    1.0 Well 34B Tigbao, Talamban, Cebu City PhP       2,446,034.34 June 21, 2012  Already complied  with MCWD Standard Requisites.
Section I. Summary     13
REPORT SUMMARY
F. SECTION VII.  PROJECTS COMPLETED IN 2012
F.3. SUBDIVISION/HOTEL/CONDO WATER SYSTEM PROJECTS  
F.3. 1 WATER SYSTEM
Name of Project  Location Project Cost Date Completed Remarks
    1.0 Prop. Water Distribution System for Colorado Homes  Cotcot, Liloan, Cebu PhP     11,043,583.41 January 17, 2012  Already complied  with MCWD Standard Requisites  
    2.0 Prop. Water Distribution System for Phebz Subdivision (Phase IB, II & III) Bag-ong Dan Road, Brgy. Tayud, Liloan PhP       2,051,167.51 January 31, 2012  Already complied  with MCWD Standard Requisites  
    3.0 Prop. Water Distribution System for The Heritage Subdivision Brgy. Jagobiao, Mandaue City, Cebu PhP       6,836,134.93 May 18, 2012  Already complied  with MCWD Standard Requisites  
    4.0 Prop. Water Distribution System for Montserrat Subdivision Brgy. Bankal, Lapu-lapu City PhP       5,458,623.83 October29, 2012 Awaiting for As-Built. Already endorsed for initial commissioning.  
    5.0 Prop. Water Distribution Main for CBP Resort Development Project Negros St., Cebu Business Park, Cebu City PhP          544,278.79 January 8, 2013 For flushing.  
F.3. 2 FLOWMETER ASSEMBLY AND VAULT              
  Name of Project  Location Project Cost Date Completed Remarks  
      1.0 Prop. 100mm Flowmeter Enclosed in Concrete Vault for Fleur de Ville Subdivision  Brgy Mactan, Lapulapu City Php          900,500.00 December 26, 2011 Already complied  with MCWD Standard Requisites    
      2.0 Prop. 150mm Flowmeter Concrete Vault for Mactan Newtown Project  Brgy Mactan, Lapulapu City Php          944,081.06 January 18, 2012  Already complied  with MCWD Standard Requisites    
    3.0 Prop. 75mm Flowmeter and Construction of Reinforced Concrete Vault for Rustan's Shopwise Cebu South Road, Mambaling, Cebu City Php          923,788.26 February  9, 2012  Already complied  with MCWD Standard Requisites  
      4.0 Prop. Flowmeter and Construction of Reinforced Concrete Vault for Villa Lucila Subdivision  Poblacion, Liloan, Cebu Php          819,000.00 February  4, 2012  Already complied  with MCWD Standard Requisites    
    5.0 Prop. Ø75mm Flowmeter and Construction of Reinforced Concrete Vault for Tune Hotel Arch. Reyes Avenue, Cebu City PhP          977,339.12 March 27, 2012  Already complied  with MCWD Standard Requisites  
      6.0 Prop. Ø75mm Flowmeter and Const. of Reinforced Concrete Vault for St. Bernadette Subd. Sudtungan, Lapulapu City Php          918,127.92 April 25, 2012  Already complied  with MCWD Standard Requisites    
    7.0 Prop. 100mm Flowmeter and Construction of Reinforced Concrete Vault for J-Center  Bakilid, Mandaue City Php       1,148,915.68 June 14, 2012  Already complied  with MCWD Standard Requisites  
    8.0 Prop. Ø75mm Flowmeter and Construction of Reinforced Concrete Vault for Avalon Cebu Business Park, Cebu City Php          950,246.82 June 28, 2012  Already complied  with MCWD Standard Requisites  
    9.0 Prop. Ø75mm Flowmeter and Construction of Reinforced Concrete Vault for Corinthians Subdivision Sudtungan, Lapulapu City Php       1,064,555.79 July 19, 2012 Awaiting compliance of the MCWD Standard Requisites
  10.0 Prop. Ø100mm Flowmeter and Construction of Reinforced Concrete Vault for Alegria Palms Cordova, Cebu Php       1,083,474.59 July 26, 2012 Awaiting compliance of the MCWD Standard Requisites
  11.0 Prop. Ø75mm Flowmeter and Construction of Reinforced Concrete Vault for Pacific Grande (Formerly Mactan Oasis Subdivision) Carajay Road, Gun-ob, Lapu-lapu City Php          955,486.22 December 6, 2012 Already up for commissioning. 
  12.0 Prop. Ø75mm Flowmeter and Construction of Reinforced Concrete Vault for Blue Coast Residences Punta Engaño, Lapu-lapu City Php          833,000.00 December 11, 2012 Awaiting for commissioning.
 
F.4. SERVICE CONNECTION TRANSFER TAPPING AND DECOMMISSIONING  
             
  Name of Project  Location Project Cost Date Completed Remarks
      1.0 Transfer Tapping Along Plaridel Street Plaridel St., Mandaue City PhP          973,000.00 March 1, 2012     
    2.0 Transfer Tapping Along Mabini Street Mabini St., Mandaue City PhP       1,300,000.00 March 27, 2012     
    3.0 Transfer Tapping and Deccommissioning at U. Alviola, Tres de Abril, V. Rama and JM Basa Streets, Cebu City U. Alviola, Tres de Abril, V. Rama and JM Basa Streets, Cebu City PhP       2,737,000.00 January 4, 2013    
Section I. Summary     14