REPORT SUMMARY |
|
|
|
|
|
|
|
|
|
|
D. SECTION
V. ON-GOING SUBDIVISION/HOTEL/CONDO WATER SYSTEM PROJECTS |
|
|
|
|
|
|
Under a Memorandum of
Agreement (MOA), the developer/owner shall fund and implement the project
and turn-over it to MCWD upon completion. MCWD is
obligated to prepare the detailed design and estimates and provide
supervision during the implementation of the project. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name
of Project |
Brief Description of the Project |
Subdivision/Hotel/Condo Name |
Developer / Owner |
MCWD Supervising Unit |
Project Amount |
Project Duration |
Date Started |
Target Completion Date |
Accomplish-
ment
To Date |
Remarks |
|
LATEST UPDATE AS OF FEBRUARY 2013 |
|
|
|
|
|
|
|
|
D.1 Water System |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Prop. Water Distribution System
for EastGate Subdivision (Matumbo, Pusok, Lapulapu) |
49.54 LM x
75mm dia |
EastGate Subdivision |
Urban Enclaves Inc. |
Project Management Office |
PhP |
514,061.34 |
11 CD |
15 Jul 2011 |
26 Jul 2011 |
0.00% |
No activity conducted for the month. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Pusok, Lapu-Lapu (Matumbo),
Pipe laying 96 LM x 75mm dia. & 126 LM x 150mm dia. D.I. |
|
|
|
|
|
|
|
|
|
|
See Part C
Section IV Subsection C.1 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 |
Prop. Water
Distribution System for Alberlyn South Subdivision (Cansojong, Talisay City,
Cebu) |
270.91
LM x 75mm dia |
Alberlyn South
Subdivsion |
AE Int'l Construction & Dev. Corp. |
Project
Management Office |
PhP |
1,122,690.12 |
25 CD |
6 Dec 2011 |
30 Dec 2011 |
99.07% |
Pipelaying
had been completed; pipeline disinfection is the only remaining work left to
be done. The pipeline disinfection is held in abeyance until completion of
the connecting line to be implemented by the Pipelines Maintenance Group. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Alberlyn South Road,
Cansojong Talisay |
|
|
|
|
|
|
|
|
|
|
See Part C
Section IV Subsection C.1 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.0 |
Prop. Water
Distribution System for Modena Mactan Subdivision (Basak, Lapu-lapu City) |
166
LM x 100mm dia., 1016 LM x 75mm dia. |
Modena Mactan
Subdivision |
Juanito King & Sons, Inc. |
Project
Management Office |
PhP |
4,011,373.95 |
95 CD |
25 Apr 2011 |
28 Jul 2011 |
|
No
activity conducted during the month. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Modena Subdivision
(Interconnecting Pipeline) |
|
|
|
|
|
|
|
|
|
|
See Part E
Section VI Subsection E.2 of the Report Summary |
|
|
|
4.0 |
Prop. PVC Water
Distribution System for Amara Subdivision - Phase 6 (Catarman, Liloan, Cebu) |
484 LM x 75mm dia., 781 LM x 100mm dia., 167
LM x 150mm dia. |
Amara
Subdivision |
Cebu Holdings, Inc. |
Project
Management Office |
PhP |
|
92 CD |
15 May 2012 |
14 Aug 2012 |
96.00% |
Contractor is on the process of
purchasing the handhole cover and AV/AR head. |
|
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Amara Waterline Project
(MCWD Counterpart) |
|
|
|
|
|
|
|
|
|
|
See Part C
Section IV of the Report Summary |
|
|
|
2.0 Prop. Rerouting of PVC
Water Distribution Line for Amara Subdivision (Catarman, Liloan, Cebu) |
|
|
|
|
|
|
|
|
|
|
See Part D
Section V of the Report Summary |
|
|
5.0 |
Prop. Rerouting of PVC Water
Distribution Line for Amara Subdivision (Catarman, Liloan, Cebu) |
1,650 LM x 150mm dia. |
Amara
Subdivision |
Cebu Holdings, Inc. |
Project
Management Office |
PhP |
|
92 CD |
15 May 2012 |
14 Aug 2012 |
96.00%[1] |
Remaining works
are:disinfection and interconnection. Interconnection to
the water tank is already completed. Remaining work is only disinfection. |
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Amara Waterline Project
(MCWD Counterpart) |
|
|
|
|
|
|
|
|
|
|
See Part C Section IV of the
Report Summary |
|
|
|
2.0 Prop. PVC Water
Distribution System for Amara Subdivision - Phase 6 (Catarman, Liloan, Cebu) |
|
|
|
|
|
|
|
|
|
|
See Part D
Section V of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section I. Summary 8 |
|
|
|
|
|
|
REPORT SUMMARY |
|
|
|
|
|
|
|
|
|
D. SECTION
V. ON-GOING SUBDIVISION/HOTEL/CONDO WATER SYSTEM PROJECTS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name
of Project |
Brief Description of the Project |
Subdivision/Hotel/Condo Name |
Developer / Owner |
MCWD Supervising Unit |
Project Amount |
Project Duration |
Date Started |
Target Completion Date |
Accomplish-
ment
To Date |
Remarks |
|
|
|
|
|
|
6.0 |
Prop. Water Distribution System
for Pueblo De Oro Communities (Sitio Judas Belt, Babag II, Lapu-lapu City)[2] |
6,920 LM x
75mm dia., 2,071 LM x 100mm dia., 1,286 LM x 150mm dia., 49 LM x 200mm dia.,
151 LM x 250mm dia. |
Pueblo De Oro Communities
(Horizon, La Aldea Del Mar, and Parkplace) |
Pueblo De Oro Development Corp. |
Project
Management Office |
PhP |
22,980,152.33 |
|
|
|
10.00% |
Pipes laid: 108 l.m. Ø 250mm
PVC, 90 l.m. Ø 150mm PVC, 42 l.m. Ø 100mm PVC. |
|
|
7.0 |
Prop. Water Distribution System
for Portville Subdivision (Aviation Road, Brgy. Buaya, Lapu-lapu City)[3] |
982 LM x 75mm
dia., 269 LM x 100mm dia., 17 LM x 150mm dia. |
Portville Subdivision |
Johndorf Venture Corp. |
Project
Management Office |
PhP |
3,430,246.86 |
94 CD |
3-Sep-12 |
6-Dec-12 |
18.00% |
Pipelaying is on-going while
procuring other materials. Contractor is replacing the other materials that
were allegedly stolen. |
|
|
D.2 Flowmeter Assembly
and Vault |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Prop. Ø150mm Flowmeter and
Construction of Reinforced Concrete Vault for Amisa Private Residences[4] |
dia.150mm
Flowmeter, Flowmeter Assembly & Interconnection |
Amisa Private
Residences |
Robinsons Land
Corporation |
Project Management Office |
PhP |
1,346,387.53 |
38 CD |
|
|
90% |
Remaining
works are: hydrotesting and disinfection. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 |
Prop. Ø150mm
Large Meter Assembly for Urban Homes Mandaue |
dia.150mm
Large Meter, Large Meter Assembly & Interconnection |
Urban
Homes |
Fog
Horn, Inc. |
Project
Management Office |
PhP |
1,428,658.31 |
46 CD |
|
|
|
Developer
has requested the testing of materials. |
|
Request material inspection |
|
|
3.0 |
Prop. Ø75mm
Flowmeter and Construction of Reinforced Concrete Meter Vault for 1016
Residences |
dia.75mm
Flowmeter, Flowmeter Assembly & Interconnection |
1016
Residences |
Ayala
Land, Inc. and Cebu Holdings, Inc. |
Project
Management Office |
PhP |
952,133.26 |
30 CD |
|
|
|
No
communication with the developer. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section I. Summary 9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|