REPORT SUMMARY |
|
|
|
|
|
|
|
|
|
|
D. SECTION
V. ON-GOING SUBDIVISION/HOTEL/CONDO WATER SYSTEM PROJECTS |
|
|
|
|
|
|
Under a Memorandum of
Agreement (MOA), the developer/owner shall fund and implement the project
and turn-over it to MCWD upon completion. MCWD is
obligated to prepare the detailed design and estimates and provide
supervision during the implementation of the project. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name
of Project |
Brief Description of the Project |
Subdivision/Hotel/Condo Name |
Developer / Owner |
MCWD Supervising Unit |
Project Amount |
Project Duration |
Date Started |
Target Completion Date |
Accomplish-
ment
To Date |
Remarks |
|
LATEST UPDATE AS OF FEBRUARY 2013 |
|
|
|
|
|
|
|
|
D.1 Water System |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Prop. Water Distribution System
for EastGate Subdivision (Matumbo, Pusok, Lapulapu) |
49.54 LM x
75mm dia |
EastGate Subdivision |
Urban Enclaves Inc. |
Project Management Office |
PhP |
514,061.34 |
11 CD |
15 Jul 2011 |
26 Jul 2011 |
0.00% |
No activity conducted for the month. |
|
contractor and subcontractor is on meeting… |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Pusok, Lapu-Lapu (Matumbo),
Pipe laying 96 LM x 75mm dia. & 126 LM x 150mm dia. D.I. |
|
|
|
|
|
|
|
|
|
|
See Part C
Section IV Subsection C.1 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 |
Prop. Water
Distribution System for Modena Mactan Subdivision (Basak, Lapu-lapu City) |
166
LM x 100mm dia., 1016 LM x 75mm dia. |
Modena Mactan
Subdivision |
Juanito King & Sons, Inc. |
Project
Management Office |
PhP |
4,011,373.95 |
95 CD |
25 Apr 2011 |
28 Jul 2011 |
97.00% |
For
issuance of substantial project completion after restoration works is
finished. |
|
Corplan has worked out the minor problems. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Modena Subdivision
(Interconnecting Pipeline) |
|
|
|
|
|
|
|
|
|
|
See Part A
Section II Subsection 10 of the Report Summary |
|
|
|
3.0 |
Prop. PVC Water
Distribution System for Amara Subdivision - Phase 6 (Catarman, Liloan, Cebu) |
484 LM x 75mm dia., 781 LM x 100mm dia., 167
LM x 150mm dia. |
Amara
Subdivision |
Cebu Holdings, Inc. |
Project
Management Office |
PhP |
|
92 CD |
15 May 2012 |
14 Aug 2012 |
96.00% |
Contractor is on the process of
purchasing the handhole cover and AV/AR head. |
|
A meeting was held. It
will be turned-over by July 2013. |
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Amara Waterline Project
(MCWD Counterpart) |
|
|
|
|
|
|
|
|
|
|
See Part C
Section IV of the Report Summary |
|
|
|
2.0 Prop. Rerouting of PVC
Water Distribution Line for Amara Subdivision (Catarman, Liloan, Cebu) |
|
|
|
|
|
|
|
|
|
|
See Part D
Section V of the Report Summary |
|
|
4.0 |
Prop. Rerouting of PVC Water
Distribution Line for Amara Subdivision (Catarman, Liloan, Cebu) |
1,650 LM x 150mm dia. |
Amara
Subdivision |
Cebu Holdings, Inc. |
Project
Management Office |
PhP |
|
92 CD |
15 May 2012 |
14 Aug 2012 |
96.00%[1] |
Remaining works
are:disinfection and interconnection. Interconnection to
the water tank is already completed. Remaining work is only disinfection. |
|
This will be included
with the project turnover above. |
|
|
|
Related Project: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 Amara Waterline Project
(MCWD Counterpart) |
|
|
|
|
|
|
|
|
|
|
See Part C Section IV of the
Report Summary |
|
|
|
2.0 Prop. PVC Water
Distribution System for Amara Subdivision - Phase 6 (Catarman, Liloan, Cebu) |
|
|
|
|
|
|
|
|
|
|
See Part D
Section V of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section I. Summary 8 |
|
|
REPORT SUMMARY |
|
|
|
|
|
|
|
|
|
D. SECTION
V. ON-GOING SUBDIVISION/HOTEL/CONDO WATER SYSTEM PROJECTS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Name
of Project |
Brief Description of the Project |
Subdivision/Hotel/Condo Name |
Developer / Owner |
MCWD Supervising Unit |
Project Amount |
Project Duration |
Date Started |
Target Completion Date |
Accomplish-
ment
To Date |
Remarks |
|
|
|
|
|
|
6.0 |
Prop. Water Distribution System
for Pueblo De Oro Communities (Sitio Judas Belt, Babag II, Lapu-lapu City)[2] |
6,920 LM x
75mm dia., 2,071 LM x 100mm dia., 1,286 LM x 150mm dia., 49 LM x 200mm dia.,
151 LM x 250mm dia. |
Pueblo De Oro Communities
(Horizon, La Aldea Del Mar, and Parkplace) |
Pueblo De Oro Development Corp. |
Project
Management Office |
PhP |
22,980,152.33 |
|
|
|
10.00% |
No activity conducted for the
month. |
|
currently doing pipelaying works.. |
|
|
7.0 |
Prop. Water Distribution System
for Portville Subdivision (Aviation Road, Brgy. Buaya, Lapu-lapu City)[3] |
982 LM x 75mm
dia., 269 LM x 100mm dia., 17 LM x 150mm dia. |
Portville Subdivision |
Johndorf Venture Corp. |
Project
Management Office |
PhP |
3,430,246.86 |
94 CD |
3-Sep-12 |
6-Dec-12 |
50.00% |
Waiting for the materials that
were allegedly stolen. |
|
|
D.2 Flowmeter Assembly
and Vault |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Prop. Ř150mm Large Meter
Assembly for Urban Homes Mandaue |
dia.150mm
Large Meter, Large Meter Assembly & Interconnection |
Urban Homes |
Fog Horn, Inc. |
Project
Management Office |
PhP |
1,428,658.31 |
46 CD |
|
|
|
Developer has
requested the testing of materials. |
|
Request material inspection |
|
|
2.0 |
Prop. Ř75mm
Flowmeter and Construction of Reinforced Concrete Meter Vault for 1016
Residences |
dia.75mm
Flowmeter, Flowmeter Assembly & Interconnection |
1016
Residences |
Ayala
Land, Inc. and Cebu Holdings, Inc. |
Project
Management Office |
PhP |
952,133.26 |
30 CD |
|
|
|
No
communication with the developer. |
|
same |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|