REPORT SUMMARY |
|
|
|
|
|
|
|
|
|
B. SECTION
III. ON-GOING JOINT VENTURE UNDERTAKINGS |
|
|
|
Name
of Contract |
Joint Venture Partner |
Minimum Volume |
Supply Cost |
Date of Contract Signing / Notice to Proceed |
Day 1
Delivery Date |
Remarks |
|
LATEST UPDATE AS OF FEBRUARY 2013 |
|
|
|
|
|
Original |
Revised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Bulk Water Supply Program - BC Homes Injection Point |
Abejo Waters Corporation |
2,000 |
m3/day |
PhP |
16.48 |
/m3 |
29 Apr 2010 |
29 Oct 2010 |
31 Aug 2012 |
The Apas
Injection Point (originally at BC Homes) has been supplying water to MCWD
since December 21, 2011. |
|
Supplier lacks data monitoring software . This pm of May
7, 2013, programmer will be presenting its program. |
|
|
|
|
|
|
|
|
|
|
|
|
|
On the
required Data Monitoring Software (calculate/tabulate/ data, show graphs,
indicate under- or over-supply), the Bulk Water Suppliers during the 21
February 2013 meeting were given the option to use the PWRI-developed Data Monitoring Software
or the Premier Portal Web. PMO is awaiting official advice from AWC of its
choice. |
|
Program is still being refined. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
VECO had
already energized the power supply of the booster pumping station on March 6,
2013. PDD had already commissioned the Ø150mm X1.60kms AWC's donated pipeline. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2.0 |
Bulk Water Supply Program - Banawa Injection Point |
Pilipinas Water Resources, Inc. |
1,500 |
m3/day |
PhP |
14.68 |
/m3 |
18 May 2010 |
18 Nov 2010 |
02 Jan 2011 |
The Banawa
Injection Point has been supplying water to MCWD since December 9, 2011. |
|
same above |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The 45 calendar days given
period for the completion to develop the full version of software had already
lapsed. The programmer is asking for extension due to some difficulties of
the program they encountered that forced them to go back from the start. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Phase I of this Joint
Venture (i.e. installation of production and supply facilities) will be
declared fully completed only after the succesful installation of the
software. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.0 |
Bulk Water Supply Program - Talamban Injection Point |
Pilipinas Water Resources, Inc. |
3,592 |
m3/day |
PhP |
14.21 |
/m3 |
19 Nov 2010 |
19 May 2011 |
5 Dec 2011 |
The Talamban
Injection Point has been supplying water to MCWD since December 6, 2011. |
|
same above |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The 45 calendar days given
period for the completion to develop the full version of software has already
lapsed. The programmer is asking for tiem extension due to some difficulties
of the program they encountered that forced them to go back from the start. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Phase I of this Joint
Venture (i.e. installation of production and supply facilities) will be
declared fully completed only after the succesful installation of the
software. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.0 |
Bulk Water Supply Program - Marigondon-Gabi Injection Point |
Mactan Rock Industries, Inc. |
5,000 |
m3/day |
PhP |
26.72 |
/m3 |
signing: 06 Dec
2010
effectivity:
01 Jan 2011 |
01 Jul 2011 |
8 Jan 2012 |
The
Marigondon-Gabi Injection Point has been supplying water to MCWD since
February 17, 2012. |
|
same above |
|
|
|
|
|
|
|
|
|
|
|
|
Mactan Rock
Inc (MRI) has formally decided to use the Software developed by Mr. Christian
Ocleasa same software being used by PWRI
for the the required Data
Monitoring Software (calculate/tabulate/ data, show graphs, indicate under-
or over-supply). |
|
|
|
|
|
|
|
|
|
|
|
|
|
On the
installed pH and Chlorine Instrument, after series of maintenance/fixing of
the logger,PDD - Water Quality Control Division had formally approved and
accepted on the tolerance of the readings of
the manual vis a vis logger readings. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
When the
upgraded version of software is already completed, installed and operational,
the project will be then finally turn-over to the end user |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section I. Summary 4 |
|
|
|
|
|
REPORT SUMMARY |
|
|
|
|
|
|
|
|
|
B. SECTION
III. ON-GOING JOINT VENTURE UNDERTAKINGS |
|
|
|
Name
of Contract |
Joint Venture Partner |
Minimum Volume |
Supply Cost |
Date of Contract Signing / Notice to Proceed |
Day 1
Delivery Date |
Remarks |
|
|
|
|
Original |
Revised |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5.0 |
Bulk Water Supply Program - Guadalupe Injection Point |
Abejo Waters Corporation |
3,000 |
m3/day |
PhP |
14.98 |
/m3 |
07 Dec 2011 |
06 Dec 2012 |
Time Extension on process |
This JV
Contract has 3 injection points spread over Brgy. Guadalupe: Guadalajara,
Kabajar, and Quijada. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Guadalajara
Injection Point : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Guadalape
injection point has been supplying
water to MCWD with a yield of 2,400 cu.m per day. This injection point has two (2) wells G-1
and G-2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Kabajar
Injection Point : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
AWC had
already resumed supplying water to MCWD since March_____, 2013 with a yield
of _____cu.m per day. To recall AWC has temporarily stopped the partial
delivery of water because pump of Well G-3 was removed and transferred to Well G-5 for the chemical and physical
test. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Quijada
Injection Point : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MCWD c/o the
office of AGM Delco is still evaluating the proposal of AWC to relocate the
Quijada injection point. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The Ø250mm
MCWD distribution line along Quijada Street, to which the AWC supply line
will connect, has yet to be installed. Installation of said Ø250mm
distribution line is presently undertaken by Dakay Construction and
Development Corporation under the project DI Expansion at Monterazzas de
Cebu. The project is expected to be completed by May 2013. For this reason,
the MCWD Execom had approved the extension of the intended Day 1 of delivery
for the Guadalupe Joint Venture is until June 30, 2013. |
|
|
|
|
|
Related Project (for Quijada Injection Point only): |
|
|
|
|
|
|
|
|
|
|
|
|
|
1.0 |
Proposed Monterrazas Pipelaying
Project |
|
|
|
|
|
|
|
|
|
See Part E Section VI Subsection E.2 of the Report Summary |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section I. Summary 5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|